Laserfiche WebLink
Schedule: <br /> -DFG is notified prior to activity in the river. <br /> Monitoring: <br /> -County shall ensure that DFG is aware of these activities by conducting periodic <br /> inspections of the site and notifying DFG of any activity in the river channel. <br /> Mitigation 14. - Transfer of title for the retention/percolation basin shall be resolved <br /> with the County prior to project construction. <br /> Implementation Responsibilities: <br /> -Applicant proposes plans for title transfer to the County. <br /> -County reviews proposal and either approves it or proposes modifications. <br /> -Applicant implements title transfer. <br /> Schedule: <br /> -Transfer of title shall occur prior to project construction. <br /> Monitoring: <br /> -None necessary. <br /> 8.3 Biology <br /> Mitigation 1. - Quarry excavation shall be limited along the bluff to the south and east <br /> of the project area to avoid removal of native trees in these areas wherever feasible. If <br /> trees cannot be feasibly avoided, mitigation shaHl be provided. Mitigation will require <br /> replacement at a ratio of five to one for valley oaks.and three to one for other native <br /> trees six inches or greater in diameter, measured at 4.5 feet above ground level. <br /> F <br /> 129 <br />