My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013248
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
17749
>
2600 - Land Use Program
>
QX-90-1
>
SU0013248
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:24:21 AM
Creation date
5/8/2020 10:56:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013248
PE
2600
FACILITY_NAME
QX-90-1
STREET_NUMBER
17749
Direction
E
STREET_NAME
STATE ROUTE 88
City
CLEMENTS
Zip
95227-
APN
01922024
ENTERED_DATE
5/6/2020 12:00:00 AM
SITE_LOCATION
17749 E HWY 88
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-Applicant installs construction fencing to protect areas within 5 feet of the drip line <br /> of trees that will not be removed. <br /> Schedule: <br /> -Grading plan and construction fencing shall be completed prior to excavation. <br /> Monitoring: <br /> -County shall conduct field inspection to confirm that fencing adequately protects drip <br /> line of trees. <br /> Miti!ation 3. - Valley oak trees shall be avoided along the bluff area south of the <br /> proposed quarry area and in riparian corridor at the proposed bridge relocation site. <br /> Implementation Responsibilities: <br /> -Applicant provides the services of a qualified biologist or certified arborist to identify <br /> valley oak trees (for protection) adjacent to proposed construction or excavation <br /> and submits a report to the County Planning Department. <br /> -County approves project or requires modification. <br /> -Applicant implements approved plan. <br /> Schedule: <br /> -The report shall be submitted and approved along with the project grading plan. <br /> Monitoring: <br /> -County shall inspect construction site to ensure that the valley oaks are protected as <br /> provided for in the approved report. <br /> Mitisation 4. - Prior to construction or grading, bright colored fencing shall be provided <br /> around trees at a distance of five feet from the dripline in areas of construction. <br /> F <br /> 131 <br />
The URL can be used to link to this page
Your browser does not support the video tag.