Laserfiche WebLink
-Applicant installs construction fencing to protect areas within 5 feet of the drip line <br /> of trees that will not be removed. <br /> Schedule: <br /> -Grading plan and construction fencing shall be completed prior to excavation. <br /> Monitoring: <br /> -County shall conduct field inspection to confirm that fencing adequately protects drip <br /> line of trees. <br /> Miti!ation 3. - Valley oak trees shall be avoided along the bluff area south of the <br /> proposed quarry area and in riparian corridor at the proposed bridge relocation site. <br /> Implementation Responsibilities: <br /> -Applicant provides the services of a qualified biologist or certified arborist to identify <br /> valley oak trees (for protection) adjacent to proposed construction or excavation <br /> and submits a report to the County Planning Department. <br /> -County approves project or requires modification. <br /> -Applicant implements approved plan. <br /> Schedule: <br /> -The report shall be submitted and approved along with the project grading plan. <br /> Monitoring: <br /> -County shall inspect construction site to ensure that the valley oaks are protected as <br /> provided for in the approved report. <br /> Mitisation 4. - Prior to construction or grading, bright colored fencing shall be provided <br /> around trees at a distance of five feet from the dripline in areas of construction. <br /> F <br /> 131 <br />