My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
110
>
2900 - Site Mitigation Program
>
PR0009005
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2020 12:04:28 PM
Creation date
5/11/2020 11:15:01 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0009005
PE
2953
FACILITY_ID
FA0004053
FACILITY_NAME
LUSTRE-CAL NAME PLATE CO
STREET_NUMBER
110
Direction
E
STREET_NAME
TURNER
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04124048
CURRENT_STATUS
01
SITE_LOCATION
110 E TURNER RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
290
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 Respondent shall contract with a registered hazardous waste hauler to transport <br /> 2 the waste to an authorized hazardous waste facility and shall comply with all <br /> 3 applicable rules and regulations. <br /> a 4. Within twenty days of the effective date of this Order, Respondent <br /> 5 shall submit to the Department a certification signed by a corporate official <br /> 6 confirming that the correction measures described in paragraphs 1 , 2, and 3 <br /> 7 have been fully implemented. <br /> 8 5. Within twenty days of the effective date of this Order, Respondent <br /> 9 shall submit to the Department for approval a plan to seal, bury, or remove the <br /> 10 "bunker" in a manner that will make the future storage of hazardous wastes <br /> 11 therein impossible. <br /> 12 6. Within twenty days of the effective date of this Order, Respondent <br /> 13 shall submit to the Department a proposed plan of correction to bring the <br /> 14 facility into compliance with the standards applicable to generators (40 CFR <br /> 15 Part 262) . If Respondent intends to obtain a permit for the treatments storage <br /> 16 or disposal of hazardous wastes, the plan of correction shall also include a <br /> 17 hazardous waste facility permit application. Upon approval by the Department, <br /> 18 Respondent shall fully implement the plan of correction in accordance with the <br /> 19 approved schedule. <br /> 20 7. Within twenty days of the effective date of this Order, Respondent <br /> 21 shall submit to the Department for approval a proposed soil sampling plan for <br /> 22 the facility parking lot, area around the storage "bunker", and any other area <br /> 23 where hazardous wastes have been disposed. The sampling plan shall include a <br /> 24 <br /> 25 <br /> 26 <br /> 27 <br /> -6- <br /> COURT PAPER <br /> STATE OF CALIFORNIA <br /> STD. 113 I REV. 6.72 <br /> B 31915 <br />
The URL can be used to link to this page
Your browser does not support the video tag.