My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
26 (STATE ROUTE 26)
>
8203
>
3500 - Local Oversight Program
>
PR0545707
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 8:50:30 AM
Creation date
5/13/2020 3:22:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545707
PE
3528
FACILITY_ID
FA0003591
FACILITY_NAME
JOHN M RISHWAIN
STREET_NUMBER
8203
Direction
E
STREET_NAME
STATE ROUTE 26
City
STOCKTON
Zip
95215-9536
APN
10114021
CURRENT_STATUS
02
SITE_LOCATION
8203 E HWY 26
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
07 June 2002 <br /> AGE-NC Project No. 99-0645 <br /> Page 2 of 9 <br /> excavation. Lower- concentrations of petroleum hydrocarbons as gasoline were also detected in the <br /> floor sample and samples collected from the north and west sidewalls. AGE calculated that <br /> approximately t26 gallons of gasoline were removed during soil over-excavation. <br /> On 15 through 17 October 2001, six soil borings were advanced at the site: three of the soil borings <br /> were established as ground water monitoring wells. The highest concentrations of petroleum <br /> hvdrocarbons were encountered in the borings at a depth of 15 bsg, with reduced concentrations <br /> encountered at depths to 70 feet bsg. A stratigraphic cross section is depicted in Figure 3 and <br /> impacted soil is depicted in Figure 3A. <br /> Based on two quarterly ground water monitoring results to date, ground water was inferred to have <br /> a northeasterly flow direction. In the November 2001 quarterly ground water monitoring event, <br /> MTBE was detected in sample MW-1, collected within the former UST location. In the April 2002 <br /> ground water monitoring samples, TPH-g was detected at 120 micrograms per liter (pgf`l) and 130 <br /> 4g/1 in well MW-1 and MW-2, respectively: BTEX compounds, MTBE and the remaining fuel <br /> additives were not detected. <br /> Additional site history and findings from previous site investigations are detailed in the AGE-prepared <br /> Evacuation and Sampling Report, dated 05 September 2000 and Preliminary Investigation and <br /> Evaluation Report, dated 07 March 2002. <br /> 3.0. SCOPE OF WORK <br /> The proposed scope of work will include the following tasks: <br /> • Pre-Field work activities; <br /> • Installation of remediation wells; <br /> • Installation of SVE system: <br /> • SVE system start-up period; <br /> • Six months of SVE operation, monitoring and maintenance; <br /> • Progress/confirmation sampling, and <br /> • Report preparation. <br /> Advan ced GeoEnviironmental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.