My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
5000
>
2900 - Site Mitigation Program
>
PR0545265
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2020 4:40:57 PM
Creation date
5/13/2020 4:01:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0545265
PE
2950
FACILITY_ID
FA0025736
FACILITY_NAME
SCK TAXIWAY D REBAB
STREET_NUMBER
5000
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
17726034
CURRENT_STATUS
01
SITE_LOCATION
5000 S AIRPORT WAY
P_LOCATION
01
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Health and Safety Plan <br /> ENSAFE RS&H <br /> Stockton Metropolitan Airport, Stockton, California <br /> January 27, 2020 <br /> 15.0 SANITARY FACILITIES AND LIGHTING REQUIREMENTS <br /> Sanitary facilities, permanent or temporary, will be provided on the job site. The requirements for <br /> sanitary facilities onsite will meet all applicable standards found in CFR 29 1910.120 (n) (3). <br /> 15.1 Toilet Facilities <br /> Number of employees Minimum number of facilities <br /> 20 or fewer One <br /> More than 20, fewer than 200 One toilet seat and one urinal per 40 <br /> More than 200 One toilet seat and one urinal per 50 <br /> 15.2 Lighting <br /> Work activities are currently planned primarily during daylight hours only; however, should the need <br /> arise for nighttime operations, the following lighting scale shall be followed. <br /> Foot-Candles Area or Operations <br /> 5 General site areas <br /> 3 Excavation and waste areas, access ways, active storage areas, loading platforms, refueling, <br /> and field maintenance areas <br /> 5 Indoors, warehouses, corridors, hallways, and exit ways <br /> Tunnels, shafts, and general underground work areas(exception: minimum of <br /> 5 10 foot-candles is required at tunnel and shaft heading during drilling, mucking, and scaling. <br /> Mine Safety and Health Administration-approved cap lights shall be acceptable for use in the <br /> tunnel heading.) <br /> 10 General shops(e.g., mechanical and electrical equipment rooms, active storerooms, barracks <br /> or living quarters, locker or dressing rooms, dining areas, and indoor toilets and work rooms) <br /> 30 First-aid stations, infirmaries, and offices <br /> 33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.