My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0003384
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MCKINLEY
>
16721
>
2600 - Land Use Program
>
SA-88-31
>
SU0003384
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2020 11:02:01 AM
Creation date
5/14/2020 4:15:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0003384
PE
2633
FACILITY_NAME
SA-88-31
STREET_NUMBER
16721
Direction
S
STREET_NAME
MCKINLEY
City
LATHROP
ENTERED_DATE
11/7/2001 12:00:00 AM
SITE_LOCATION
16721 S MCKINLEY
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item No . 3 <br /> PC : 5-19-88 <br /> SA-88-31 <br /> Page 6 <br /> Conditions 3 (a) , 3 (b) , 3 (c) , and 4 (d) are ordinance requirements <br /> and cannot be waived. Several of the points in the appeal refer <br /> to conditions that may be waived at the Improvement Plan stage if <br /> they are found to be not applicable, but they are put in just in <br /> case they are required. For instance, if there will be no <br /> grading, then grading plans are not required. <br /> Staff is aware that the applicant considers the uses to be short- <br /> term in nature and is, therefore, reluctant to make the recom- <br /> mended improvements. However, staff is not in the position to <br /> grant a temporary permit . The applicant may want to discontinue <br /> the uses at the project site until such time as the longevity of <br /> the project is established. <br /> Development Plan No. DP-87-76 for the steel fabrication plant <br /> located immediately north of the project site was approved on <br /> June 10, 1987 , and similar conditions were required. This use is <br /> now constructed, and all requirements have been fulfilled. <br /> ENVIRONMENTAL CONSIDERATIONS : <br /> An Initial Study was prepared for the project on March 23, 1988 . <br /> No significant effects to the environment were identified. On <br /> that basis, a Negative Declaration has been prepared for the pro- <br /> ject . <br />
The URL can be used to link to this page
Your browser does not support the video tag.