Laserfiche WebLink
Tony Palma - 2 - 21 February 2020 <br /> • Revise the Facility site map to show the flow direction of the existing storm drain <br /> system. <br /> To demonstrate compliance with the Industrial General Permit, please upload copies of <br /> the following documents to the Facility's file in the State Water Resources Control <br /> Board's Stormwater Multiple Application and Report Tracking System (SMARTS) by <br /> 20 March 2020: <br /> • Copies of routine inspection reports for the months of November 2019 through <br /> February 2020. <br /> • A revised SWPPP to include the all of the information requested. <br /> • A revised Facility site map to include the storm drain system flow direction and <br /> the location of the oil/water separator. <br /> • Photographs showing the elimination of the sawdust stockpile at the cutoff <br /> buildings. <br /> If you have any questions, please contact me at Jorge.Beltran(abwaterboards.ca.gov or <br /> 916-464-4794. <br /> JORGE L. BELTRAN, P.E. QSD/P <br /> Water Resources Control Engineer <br /> Enclosure: 14 February 2020 Inspection Report <br /> cc by email: Kristine Karlson, US EPA, Region IX, San Francisco. <br /> John Alaniz, REHS San Joaquin County Environmental Health and Safety. <br />