Laserfiche WebLink
Mr. Mark Buller, Idealease 0 2 ` 15 October 2009 <br /> Idealease 1137 South Stockton Street, Stockton <br /> 3. The Work Plan does not state which soil samples will be submitted for laboratory <br /> analysis from the soil borings. By 14 November 2009, Idealease needs to submit a <br /> work plan addendum that indicates which soil samples will be analyzed from each <br /> boring. <br /> 4. Idealease needs to abandon the soil borings in accordance with San Joaquin County <br /> Well Standards. <br /> In summary, by 14 November 2009, please submit a work plan addendum to describe how <br /> Idealease will determine the total depth of deep borings and the number of soil samples it will <br /> analyze. In addition, by 12 February 2010, Idealease needs to drill the soil borings, install the <br /> four monitoring wells, and submit a report of findings. <br /> If you have any questions, you may contact me by phone at (916) 464-4819 or email me at <br /> kshelton(o)waterboards.ca.gov. <br /> KRISTI SHELTON, P.E. <br /> Water Resources Control Engineer <br /> Aboveground Tanks Cleanup Unit <br /> cc: Ms. Margaret Lagorio, San Joaquin County Environmental Health Division, Stockton <br /> Ms. Kama Herrigfeld, Herum-Crabtree <br /> Mr. Robert Marty, Advanced GeoEnvironmental, Stockton <br />