Laserfiche WebLink
Remedial Well and Soil Vapor Extraction System Installation Report 6 <br /> Ranh Market 23569 South Santa Fe Road Riverbank CA November 27 2002 <br /> C sent to Kiff Analytical and analyzed for TPHg, BTEX, and MtBE by EPA Method 8260B, <br /> and total lead by EPA Method 6010 TPHg, BTEX, and MtBE were not detected in sample <br /> SP-1 (ABC) above laboratory reporting linvts TPHg was detected at 5 1 mg/kg in SP-2 <br /> (AB), and benzene and MtBE were not detected above laboratory reporting limits Total lead <br /> was reported in SP-1 (ABC) and SP-2 (AB) at concentrations of 3 08 mg/kg and 5 96 mg/kg, <br /> respectively Copies of the laboratory analytical report are provided in Appendix E <br /> Drilling activities also generated six drums containing equipment rinsate water The water <br /> was removed from the site by Integrated Wastestream Management and taken to Seaport <br /> Environmental in Redwood City, CA for disposal The non-hazardous waste manifest is <br /> provided in Appendix F <br /> 5.0 RESULTS OF SAMPLING ANALYSIS <br /> 51 Results of Soil Sampling <br /> The highest concentrations of hydrocarbons in soil were found west of the former UST pit (S- <br /> 7) The highest levels of TPHg, benzene, and MtBE were reported in the 25-foot sample from <br /> S-7 at concentrations of 6,600 mg/kg, 49 mg/kg, and 0 52 mg/kg, respectively (Figure 3 and <br /> Table 1) The 20-foot soil sample from well S-12 contained low levels of TPHg (11 mg/kg), <br /> benzene (0 30 mg/kg), and MtBE (0 023 mg/kg) The remaining soil samples in S-12, and the <br /> soil samples from S-13 and S-17, did not contain TPHg, benzene, and MtBE above laboratory <br /> detection limits, except for 0 0076 mg/kg xylenes in S-17 (35 feet bgs) Copies of the <br /> analytical data are included in Appendix E <br /> 6.0 REMEDIATION SYSTEM INSTALLATION ACTIVITIES <br /> 6.11 Remedial System Piping <br /> Construction activities for the installation of the remediation system at the Ranch Market site <br /> began on July 29, 2002 SECOR oversaw the El Dorado Remediation Group (ERG) of El <br /> Dorado Hills, California complete the various stages of the remediation system installation <br /> The remediation system location was not completed until the trench for the remedial piping <br /> was completed In addition to existing SVE wells well V-1 through V-6, new SVE wells V-7 <br /> through V-10 were piped to the compound location (Figure 3) Ozone sparge wells S-1 <br /> through S-20 were also piped to the compound location <br /> Individual 2-inch diameter Schedule 40 polyvinyl chloride extraction lines were run from ten <br /> soil vapor extraction wells V-1 through V-10, to the remediation compound Individual Ch- <br /> inch diameter butt-welded Purad PVDF lines were run from twenty ozone sparge wells S-1 <br /> through S-20, to the remediation compound The SVE lines and ozone sparge lines were <br /> buried a minimum of 2 feet bgs in the trenches leading from each respective SVE or ozone <br /> sparge well to the remediation compound Electrical warning tape was installed above the <br /> I\Ranch Market-Rtverbank\Reports\RB-Reined Well Install doc SECOR International Incorporated <br />