Laserfiche WebLink
Remedial Well and Soil Vapor Extraction System Installation Report 3 <br /> Ranch Market 23569 outh Santa Fe Road,Riverbank, A November 27 2002 <br /> • • On April 28, 2000, the RWQCB conditionally approves SECOR's Apn1 25, 2000 <br /> Revised Work Plan For Soil and Groundwater Assessment Final approval was <br /> granted on June 1, 2000 via an email from the RWQCB <br /> • On May 18, 2000, SECOR oversaw the down-hole video logging of domestic <br /> wells DW-1 and DW-2 SECOR submitted the May 23, 2000, Domestic Well <br /> Vtdeo Survey Report to the RWQCB The video log revealed the domestic well <br /> DW-2 that contained reportable concentrations of MtBE, was approximately 59 <br /> feet deep and had a hole in the casing at 32 and 40 feet bgs Well DW-1 was 70 <br /> feet deep and appeared to be screened from 60 to 70 feet bgs <br /> • Between July 17-18, 2000, SECOR oversaw the advancement of GeoprobeTM <br /> borings GP-1 through GP-4 north, east, and south of the former UST location <br /> (Tables 1 and 3) On July 24, 2000, SECOR advanced two continuous core soil <br /> borings, SB-1 and SB-2, to 70 feet bgs to define the lithology and vertical <br /> impacts to soil (Tables 1 and 3) On August 8-11, 2000, SECOR oversaw the <br /> installation of MW-5D and MW-5 through MW-9 to define the vertical and <br /> lateral extent of soil and groundwater impacted with gasoline released from the <br /> former UST at the Site <br /> • A report was submitted by SECOR entitled Evaluation of Potable Water <br /> Sources, dated August 18, 2000, to the San Joaquin County Public Health <br /> Services, Environmental Health Division (SJCEHD) and the RWQCB <br /> • September 6, 2000, SECOR attended a meeting with the RWQCB, SJCEHD, and <br /> SWRCB UST Cleanup Fund to review the assessment results and plans for the <br /> supply of potable water to the Pantoja Property <br /> • A work plan was submitted by SECOR entitled Work Plan For Well Installation <br /> and Feasibility Testing, dated September 13, 2000 to the RWQCB <br /> • A report was submitted by SECOR entitled Additional Evaluation of Potable <br /> Water Sources, dated September 14, 2000 to the San Joaquin County Public <br /> Health Services, Environmental Health Division (SJCEHD) and the RWQCB <br /> • In December 2000, Bradley and Sons Drilling installed domestic well DW-21Z on <br /> the Pantoja property to replace well DW-2, which was destroyed by Gregg <br /> Drilling on January 11, 2001 The new domestic well was brought online on <br /> January 18, 2001 <br /> • On September 21 and 22, 2000, SECOR oversaw the installation of air sparge <br /> well AS-1 and six soil vapor extraction wells, V-1 through V-6 adjacent to the <br /> former tank pit at the Site A soil vapor extraction/air sparge feasibility test <br /> (SVE/AS) was conducted between October 2 and 3, 2000 The SVE extraction <br /> rates ranged from 95 to 220 standard cubic feet per minute (SCFM) and the <br /> radius of influence was estimated to be 40 feet <br /> I\Ranch Market-RiverbanklReports\RB-Reined Well Install doc SECOR International incorporated <br />