My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SAN JOAQUIN
>
345
>
3500 - Local Oversight Program
>
PR0545671
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2020 11:44:18 AM
Creation date
5/19/2020 11:40:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545671
PE
3528
FACILITY_ID
FA0003959
FACILITY_NAME
AT&T CALIFORNIA - UE042
STREET_NUMBER
345
Direction
N
STREET_NAME
SAN JOAQUIN
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
02
SITE_LOCATION
345 N SAN JOAQUIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
%.101 INTERN., TECHNOLOGY CORPORATION <br /> A one to two foot bentonite seal will be placed over the gravel pack. Each well will then be <br /> sealed to the surface with a 95% portland cement and 5% bentonite grout mix (Figure 4). <br /> 2.5 Well Development <br /> L. The wells will be developed no less than 24 hours after completion. Well development will <br /> allow the hydraulic conductivity of the formation near the well to be restored and sediment <br /> that resulted from the drilling and installation of the wells to be removed. IT will develop the <br /> wells by initially surging each well utilizing a bailer and or surge block. After the wells are <br /> ' sufficiently surged, the wells will be evacuated by removing approximately ten well volumes <br /> i_ <br /> of water. All groundwater removed from the wells and decontamination liquids will be <br /> containerized pending characterization and proper disposal. The wells will be considered <br /> developed when measurements of temperature, conductivity and pH stabilize and when the <br /> v <br /> r water is relatively free of suspended material. The maximum differentials, which will be <br /> taken as an indication of stabilization of the water being purged between 3 consecutive <br /> l readings, are as follows: <br /> [Parameter Maximum Differential for Stabilization <br /> } Electrical Conductivity 10% of the instrument scale unit. <br /> Temperature degrees Fahrenheit 10 <br /> �L. <br /> P H 0.1 unit <br /> Water clarity Discharged water is clear or color stable <br /> Field parameters will be recorded on a data sheet and included in the technical report <br /> appendices. The purged water will be stored on-site in 55 gallon, (DOT-17E) drums until <br /> analyses are completed. The water will be properly disposed of as determined by the <br /> L analytical results. <br /> 2.6 Well Sampling <br /> The wells will be sampled in conjunction with the next planned quarterly well sampling at the <br /> site. Water level measurements will be made using a Solinst brand water level indicator. <br /> Then the wells will be checked for the presence of free product utilizing an interface probe. <br /> ' The thickness of any free product layer will be recorded. Water level data will be recorded <br /> for groundwater flow direction and gradient calculations. <br /> MZA)9-28-92,/ENGM83.N ER 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.