Laserfiche WebLink
' incidents or accidents which had thelost- <br /> time potential to cause a lost tune or hospitalization incident <br /> or fatality within 24 hours of the incident. <br /> The PM for this job is Sydney GeeIs. <br /> 2.3 Project Health and Safety Manager <br /> ' The Project HS Manager is responsible for the preparation and modification (as necessary) of <br /> this HASP The Project HS Manager will approve changes and update the HASP as <br /> ' warranted by altered site conditions and shall have the only authorization to effect such <br /> changes (except those changes outlined in the Emergency Response Plan) The Project HS <br /> ' Manager will advise the PM on health and safety issues which may have an impact on project <br /> operations In addition, responsibility of the Project HS Manager includes: <br /> • General health and safety program administration; <br /> • Provide technical assistance to the PM and the Project FC; <br /> • Investigate significant accidents, illnesses and nearmisses. Recommend <br /> corrective actions as appropriate Review all Accident/Incident Investigation <br /> Reports; <br /> • Determine required personal protective equipment for each work area, <br /> • Assist the FC in establishing decontamination area locations; <br /> • Evaluate and approve contractors regarding health and safety compliance both <br /> prior to accepting the contract and upon completion of the project, as <br /> appropriate, and <br /> • Conduct exposure monitoring to determine type and extent of personnel exposure <br /> and to assess the appropriateness of protective measures <br /> The Project HS Manager is Mark Freiberg Mr. Freiberg is a Certified Industrial Hygienist <br />' (CIH) and a Certified Safety Professional (CSP). <br />' 2.4 Project Field Coordinator <br /> The Project Field Coordinator (FC) reports to the PM and is responsible for field <br />' implementation of the HASP This includes communicating project health and safety <br /> requirements to all on-site project personnel (both IT and subcontractor personnel), field <br /> supervision, consultation with the Project HS Manager regarding changes to the HASP and <br /> conducting monthly health and safety inspections The Project FC is responsible for <br /> informing the Project HS Manager and the PM of any changes to the workplan, prior to <br /> implementation, so that health and safety issues introduced by those changes may be properly <br /> M7/054)9-9VUSTM-0063 bk 2-3 <br /> 1 <br />