Laserfiche WebLink
107 School Street,Lodi,Chronology <br /> Page 2 <br /> 09/21/92 Date SJC/EHD received a copy of a letter from SWRCB-Cleanup fund <br /> rejecting the site from eligibility because the RP has been consistently out <br /> of compliance with regulatory directives. <br /> 10/12/98 Three geoprobe soil borings advanced onsite this date; two to 60 feet <br /> below surface grade. See Advanced GeoEnvironmental, Inc. (AGE) <br /> "Preliminary Site Assessment Report" dated 02/16/99. <br /> 11/98- Eleven soil borings were advanced this date; 60 feet deep. Seven of the <br /> 01/99 borings were converted.to groundwater monitoring wells. Four of the <br /> borings were for sample collection only. See AGE "Preliminary Site <br /> j Assessment Report"dated 02/16/99. <br />' 4/19-21/99 Monitoring well MW-8 was installed; Test wells VW-1, SW-1 and SW-2 <br /> i were installed. See AGE report"Quarterly Report— May 1999" dated <br /> i 06/29/99. <br /> 05/13/99 Feasibility.pilot testing performed. Air sparge and soil vapor extraction <br /> test. See AGE report"Corrective Action Plan =June 1999" dated <br /> .06/10/99. <br /> 07/15/99 Aquifer pumping test performed. See AGE report Quarterly Report— <br /> August 1999" dated 08/31/99. <br /> I <br /> 01/31/00 "Remedial Action Work Plan" submitted this date, proposing SVE/AS. <br /> 02/00- Remediation wells installed. Seven air sparge (SW3-SW9) and six SVE <br /> 03/00 (VW2-VW7)wells. See AGE report Remediation System Installation <br /> dated 10/04/00. <br /> 04/19/00 Startup of SVE/AS remediation system, see 10/04/00 AGE report. <br /> 05/19/00 :Notice of Responsibility sent this.date to new property owner, Lodi City <br /> Center 12 LLC c/o Anthony Barkett. Anthony Barkett and Edward <br /> Barkett, of Atlas Properties, Inc. have purchased property to develop it <br /> with a movie theater and restaurants. <br /> 02/27/01 Date SVE/AS system was shut down in preparation for site <br /> j redevelopment. <br /> 03/01/01 SVE system using carbon canisters for vapor destruction was restarted <br /> this date. <br /> 04/01 Remediation system was removed from the site this date for construction <br /> of Lodi Theater building. <br /> 04/23/01 Date of destruction of MW-1, which had a building built over it. <br />