My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SCHOOL
>
107
>
3500 - Local Oversight Program
>
PR0545674
>
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2020 9:50:56 AM
Creation date
5/20/2020 9:42:48 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0545674
PE
3528
FACILITY_ID
FA0006039
FACILITY_NAME
MARK NEWFIELD
STREET_NUMBER
107
Direction
N
STREET_NAME
SCHOOL
STREET_TYPE
ST
City
LODI
Zip
95240
CURRENT_STATUS
02
SITE_LOCATION
107 N SCHOOL ST
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
107 School Street,Lodi,Chronology <br /> Page 2 <br /> 09/21/92 Date SJC/EHD received a copy of a letter from SWRCB-Cleanup fund <br /> rejecting the site from eligibility because the RP has been consistently out <br /> of compliance with regulatory directives. <br /> 10/12/98 Three geoprobe soil borings advanced onsite this date; two to 60 feet <br /> below surface grade. See Advanced GeoEnvironmental, Inc. (AGE) <br /> "Preliminary Site Assessment Report" dated 02/16/99. <br /> 11/98- Eleven soil borings were advanced this date; 60 feet deep. Seven of the <br /> 01/99 borings were converted.to groundwater monitoring wells. Four of the <br /> borings were for sample collection only. See AGE "Preliminary Site <br /> j Assessment Report"dated 02/16/99. <br />' 4/19-21/99 Monitoring well MW-8 was installed; Test wells VW-1, SW-1 and SW-2 <br /> i were installed. See AGE report"Quarterly Report— May 1999" dated <br /> i 06/29/99. <br /> 05/13/99 Feasibility.pilot testing performed. Air sparge and soil vapor extraction <br /> test. See AGE report"Corrective Action Plan =June 1999" dated <br /> .06/10/99. <br /> 07/15/99 Aquifer pumping test performed. See AGE report Quarterly Report— <br /> August 1999" dated 08/31/99. <br /> I <br /> 01/31/00 "Remedial Action Work Plan" submitted this date, proposing SVE/AS. <br /> 02/00- Remediation wells installed. Seven air sparge (SW3-SW9) and six SVE <br /> 03/00 (VW2-VW7)wells. See AGE report Remediation System Installation <br /> dated 10/04/00. <br /> 04/19/00 Startup of SVE/AS remediation system, see 10/04/00 AGE report. <br /> 05/19/00 :Notice of Responsibility sent this.date to new property owner, Lodi City <br /> Center 12 LLC c/o Anthony Barkett. Anthony Barkett and Edward <br /> Barkett, of Atlas Properties, Inc. have purchased property to develop it <br /> with a movie theater and restaurants. <br /> 02/27/01 Date SVE/AS system was shut down in preparation for site <br /> j redevelopment. <br /> 03/01/01 SVE system using carbon canisters for vapor destruction was restarted <br /> this date. <br /> 04/01 Remediation system was removed from the site this date for construction <br /> of Lodi Theater building. <br /> 04/23/01 Date of destruction of MW-1, which had a building built over it. <br />
The URL can be used to link to this page
Your browser does not support the video tag.