My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SECOND
>
106
>
3500 - Local Oversight Program
>
PR0545680
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2020 1:27:36 PM
Creation date
5/20/2020 1:01:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545680
PE
3528
FACILITY_ID
FA0005535
FACILITY_NAME
THIEMANS SERVICE
STREET_NUMBER
106
STREET_NAME
SECOND
STREET_TYPE
ST
City
RIPON
Zip
95366
CURRENT_STATUS
02
SITE_LOCATION
106 SECOND ST
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. T . <br /> RZOM <br /> Working To Restore Nature <br /> • (one quarter). RESNA proposes one additional monitoring well to be installed in the <br /> predominately downgradient location, southeast of the former UST's. If future monitoring <br /> episodes indicate a consistent change in flow direction, the need for additional wells will be <br /> reevaluated. <br /> L <br /> The Site Characterization Report (AquaGeosciences, September 1993) presented results of soil <br /> L, sample analyses which has been construed to indicate that the extent of TPHg in soil was not <br /> defined at 30 feet bgs north of the former tank excavation. It was reported that boring TH-5 <br /> L contained concentrations of TPHg at 0.37 parts per million (ppm) at a depth of 30-30.5 feet bgs <br /> ('fable 3). As stated in the Site Characterization Report, the Practical Quantitation Limit of the <br /> L. State-certified laboratory was 1.0 ppm for TPHg making this data questionable and inappropriate <br /> for use as an indication of soil contamination. RESNA concludes that soil contamination is <br /> �- defined (< 1.0 ppm) to the north at a depth of 30 feet bgs and therefore additional soil borings <br /> in this vicinity are not warranted (Plate 3). <br /> L/ <br /> PURPOSE AND PROPOSED WORKSCOPE <br /> L The purpose of this site investigation is to further define the extent of groundwater <br /> contamination. To achieve this goal the following scope of work is proposed: <br /> L, <br /> • Install one additional groundwater monitoring well; <br /> I <br /> �' • Analyze selected soil samples for total petroleum hydrocarbons as gasoline (TPHg), <br /> benzene, toluene, ethylbenzene and xylenes (BTEX), and total lead; <br /> L • Survey and develop the new well, purge and collect samples from all monitoring wells; <br /> L • Prepare a Problem Assessment Report (PAR). <br /> LThe workplan below describes in detail each of the tasks to be completed to further define the <br /> extent of groundwater contamination. All work described in this workplan will be performed <br /> Lin accordance with RESNA's Quality Assurance/Quality Control Plan presented in Appendix I <br /> and with the Site Safety Plan presented in Appendix II. <br /> V <br /> 150078\REP0RTS\WP-0890.FNL 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.