My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SHAW
>
1013
>
3500 - Local Oversight Program
>
PR0545685
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2020 9:24:49 AM
Creation date
5/21/2020 9:23:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545685
PE
3528
FACILITY_ID
FA0006081
FACILITY_NAME
PATTERN STEEL CO
STREET_NUMBER
1013
STREET_NAME
SHAW
STREET_TYPE
RD
City
STOCKTON
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
1013 SHAW RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
%W I nWrvn nenwl Consultarw, Inc. <br /> Health & Safety Plan <br /> Page: 3 <br /> L <br /> 2.0 SAFrETYIMPT.F.MF.NTATION <br /> The provisions of the WHF Environmental Consultants, Inc. Health and Safety Plan <br /> are mandatory for all personnel associated with the site project and operations. <br /> A complete background review and site visitation will be conducted in order to <br /> determine whether specific amendments are to be made to the Health and Safety Plan <br /> Lr based on specific characteristics which may exist on the job site. Any suspected <br /> hazards associated with the on-site operation which exposure to, via inhalation or skin <br /> L absorption, to such as suspected carcinogens or human sterilants, will be documented <br /> and specific guidance will be developed and added to this Health and Safety Plan as <br /> Appendices. <br /> A definedla ro'ect site out is paramount to the safe completion of all remedial site <br /> P J Y <br /> investigations. The project site layout has built-in safety features. The site is divided <br /> into three zones. The following list defines the required personnel protective <br /> equipment. <br /> 2.1 Personnel Protective Equipment {PPE) <br /> Personnel who will be working in or around the exclusion zone of the job site <br /> will use the following protective equipment and measures as warrant by the <br /> LProject Manager: <br /> Coveralls as an undergarment <br /> - Saranex outer garment <br /> Sample gloves (inner) <br /> - PVC, Nitrile or Neoprene outer gloves <br /> L - Hard hat <br /> - Steel toe boots <br /> - Robars or Tingley boots <br /> L - Full facepiece respirator with R53HE cartridges (a combination of <br /> organic vapor, acid gas, pesticide, radionuclide, high efficiency filter). <br /> Note that cartridges should be changed daily. <br /> All joints to be taped <br /> - Self-contained air will be utilized if project dictates <br />
The URL can be used to link to this page
Your browser does not support the video tag.