Laserfiche WebLink
WHF,Fnvironmental Consultants, Inc. <br /> Health & &gWy Plan <br /> Page. 4 <br /> More stringent protective equipment requirements will be implemented if <br /> necessary. This determination will be made by the project supervisor after <br /> review of the materials to be handled, the ambient monitoring data, consultation <br /> with on-site technical personnel, the Safety Officer, and the proper management <br /> personnel. Upgrades in PPE, if necessary, will be implemented. <br /> 2.2 General Safety <br /> C The on-site Safety Officer will be responsible for the following daily safety <br /> implementations: <br /> 2.3 Daily Safety Meetings <br /> Each day prior to commencing work, a safety meeting shall be held to discuss <br /> safety considerations for the day's work to be done. A safety topic shall be <br /> _ addressed each day from the following list: <br /> - Site Safety Plan (first day and once a week thereafter) <br /> - Fire Fighting Techniques <br /> - Defensive Driving <br /> Decontamination <br /> - Levels of Protection <br /> - Heat Stress <br /> - Emergency Equipment on Site <br /> - confined Space Entry Procedure - Respirator Maintenance <br /> - Self-contained Breathing Apparatus Training (if necessary) <br /> 2.4 Safety Log <br /> A safety log shall be kept for the project work site. <br /> 2.5 Bating, Drinking, Smoking <br /> Eating, drinking, and smoking shall be allowed only in the designated areas in <br /> the support zone. No personnel may eat, drink, or smoke on-site in any other <br /> area except as permitted by the SSO. <br />