Laserfiche WebLink
ARCAUIS Site Investigation Work Plan <br /> 401 North San Jose Street,Stockton,California <br /> Soil samples will be sealed, labeled,and placed in an Ice-filled cooler and shipped under appropriate chain- <br /> of-custody protocols to Lancaster Laboratories,Inc. in Lancaster, Pennsylvania. <br /> 3.5 Groundwater Monitoring Well Installation <br /> Four shallow groundwater monitoring wells will be installed, Proposed tentative locations of the wells are <br /> shown on Figure 2. .Well locations may be revised based on the findings of the CPT investigation. Planned <br /> well completion details are shown on Figure 3 <br /> An air-knife will be used to clear each borehole from ground surface to 8 ft one inch bgs.Following air- <br /> knifing activities,each borehole will be installed using a truck-mounted drill rig with 8.25-Inch outer dlameter <br /> (Op)hollow stem augers. During Installation of each soll boring,continuous two-foot stainless steel split- <br /> spoon <br /> plitspoon samples of soil will be collected per ASTM Method D-1586. Continuous soil samples will be collected <br /> from ground surface to a target depth;final depths will be determined in the field. Each discrete Interval will <br /> be logged for stratigraphic properties, including soil type,color, and moisture content..In addition,field <br /> observations will be noted regarding observed odor,staining,and relative volatile organic compound <br /> concentrations as measured with a photolonization detector(PID)from soil head space, Soli samples will <br /> be collected from approximately every 5 ft from the borings. The exact sample depths will be selected in the <br /> field based on geologic information and observations of potential staining and/or odor, <br /> The soil samples will be analyzed for the following constituents by a California-certified laboratory. <br /> • Title 221CAM17 metals by EPA 60106 <br /> • TPH-GRO,TPH-DRO,TPH-mo by USEPA Method 8015 Modified <br /> • BTEX, MTBE, 1,2-DCA, ethanol, DIPS, ETRE, TAME,TBA and EDB by USEPA Method 8260D <br /> Soil samples will be sealed, labeled,and placed in an ice-filled cooler and shipped under appropriate chain- <br /> of-custody protocols to Lancaster Laboratories, Inc. in Lancaster, Pennsylvania. <br /> 3.5.1 Monitoring Weil Construction <br /> Each monitoring well wig be constructed with two-inch outer diameter(OD)schedule 40 polyvinyl chloride <br /> (PVC)casing. Solid riser will be Installed from the top of the screen to approximately three Inches bgs for <br /> completion with a flush-mount well cover.The screen will be constructed with two-inch-OD 0.010-slot PVC <br /> V-wire casing. Centralizers will be installed every 10 feet to center the casing In the borehole.The annular <br /> space will be filled with No.2/12 Monterey Sand to two feet above the top of the well screen.A hydrated <br /> bentonite slurry seal measuring two feet in thickness will be placed above the sand pack and allowed to <br /> e <br />