My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_PART 1 FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HOWLAND
>
16777
>
2900 - Site Mitigation Program
>
PR0009015
>
WORK PLANS_PART 1 FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2020 2:11:25 PM
Creation date
5/26/2020 1:12:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
PART 1 FILE 1
RECORD_ID
PR0009015
PE
2960
FACILITY_ID
FA0004094
FACILITY_NAME
J R SIMPLOT (OCCIDENTAL CHEMICAL)
STREET_NUMBER
16777
STREET_NAME
HOWLAND
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19818005
CURRENT_STATUS
02
SITE_LOCATION
16777 HOWLAND RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.0 CONNECTION OF WELL INTO EXISTING EXTRACTION WELL NETWORK <br /> 6.1 Well Head Connection to Existing Extraction Well Pipeline <br /> After the well head has been completely constructed, the Contractor will <br /> connect the well head to the existing extraction well pipeline. This will include <br /> pipe trenching, pipeline installation and pipeline connection. The location of the <br /> existing pipeline is shown on Figure 3. The location for the extraction well pipeline <br /> connection will be the responsibility of the supervising personnel. The well head <br /> completion shall be as detailed on the drawings contained in Appendix C. All <br /> piping equipment and instruments will be supplied and installed by the Contractor. <br /> The electrical connection will be made by TreaTek. <br /> 6.2 Extraction Well Peripheral Fencinq <br /> Once all mechanical work has been completed for the connection to the <br /> existing piping, the contractor shall install a perimeter fence identical to that <br /> currently existing around EW-4. If at all possible, the existing fencing material <br /> from EW-4 is to be used. <br /> 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.