Laserfiche WebLink
6.0 CONNECTION OF WELL INTO EXISTING EXTRACTION WELL NETWORK <br /> 6.1 Well Head Connection to Existing Extraction Well Pipeline <br /> After the well head has been completely constructed, the Contractor will <br /> connect the well head to the existing extraction well pipeline. This will include <br /> pipe trenching, pipeline installation and pipeline connection. The location of the <br /> existing pipeline is shown on Figure 3. The location for the extraction well pipeline <br /> connection will be the responsibility of the supervising personnel. The well head <br /> completion shall be as detailed on the drawings contained in Appendix C. All <br /> piping equipment and instruments will be supplied and installed by the Contractor. <br /> The electrical connection will be made by TreaTek. <br /> 6.2 Extraction Well Peripheral Fencinq <br /> Once all mechanical work has been completed for the connection to the <br /> existing piping, the contractor shall install a perimeter fence identical to that <br /> currently existing around EW-4. If at all possible, the existing fencing material <br /> from EW-4 is to be used. <br /> 23 <br />