Laserfiche WebLink
Describe any irrigation facilities: None present on the 40 acre project area. <br /> The only irrigation facilities present is an burried irrigation pipeline <br /> on the southwestern and western perimeter of the property. <br /> Is the area subject to flooding or other natural hazards: <br /> The area is within the flood plain of the San Joaquin River and is subject <br /> to annual flooding. The proposed project is designed recontour the sandbar <br /> to prevent further errosional impact to the property. <br /> PROPOSAL <br /> Provide an estimate of the value of the mined materials by type and by phase: <br /> The material to be produced is sand with an estimated value of 50.15/vd3' <br /> Mining Method(s) <br /> (Check all applicable) <br /> _Open Pit _Drill and Blast <br /> _Hilltop Quarry _Shovel <br /> Sidehill Quarry _Dragline <br /> Gravel/Sand Pit _Waste Dump <br /> X Sand Bar Skimming _Tailings Ponds <br /> Clay Pit _Truck to Processing Plant <br /> _ <br /> Borrow Pit Rail Transport <br /> _Single Bench _Slurry Pipeline <br /> Multiple Bench _Other (specify) <br /> Underground <br /> Area of Excavation <br /> Excavation Acres: 40 Volume: 500,000 yd <br /> Indicate the type, depth and volume of overburden: The sand to be removed <br /> represents recent flood deposited accumulations of sand and no overburden is <br /> present. <br /> 9 <br /> 3 <br /> - Page 3 - <br /> s <br />