Laserfiche WebLink
i <br /> Is all or a portion of this property subject to a Williamson Land Act contract <br /> (i.e., an agricultural preserve)? Yes_ No X <br /> Anticipated annual production (include all mined materials such as overburden, <br /> waste rock, ore, etc.) : 20 loads/day - 600 loads/month - 14 yds/load - 7200 <br /> loads/year - 100,000yds/year. <br /> History <br /> Is the proposal an expansion of an existing and/or historic mine or quarry? <br /> Yes X No. If yes, describe briefly (specify existing, historic, or both.) <br /> Excavation/Reclamation Schedule <br /> Estimated Time Frames Begin End <br /> Exploration <br /> Construction <br /> Operation 1989 2009 <br /> Reclamation Concurrent Concurrent <br /> For seasonal operation, list operating months: <br /> The project will operate in those months when the sand bar is not flooded._ <br /> Primary months of operation will be March through October for the estimated <br /> five vears of primary production Operations will then be conducted <br /> annually to maintain the design characteristics of the bar. <br /> Operational Characteristics <br /> Will there be any potentially hazardous materials, such as toxic substances, <br /> flammables, or explosives used or stored at the site? <br /> Yes X No <br /> If yes, describe the method of use, storage, and disposal: The only exception <br /> will be the storage of a limited quantity of fuel on the site for the <br /> refueling of mobil equipment. <br /> - Page 4 - <br /> r <br />