Laserfiche WebLink
r <br /> Estimated number of employees: <br /> Construction Phase <br /> Operational Phase(s) 4 employees <br /> Describe the proposed access to the project: <br /> Frontage on County/State Highway <br /> X Private Road Easement 20 feet width two (2) miles length <br /> From what County or State road? Kasson Road <br /> Prescriptive Right <br /> _Other (explain) <br /> Describe off-site hauling of sand, aggregate ore, waste, or other mined material? <br /> X Yes _ No. If yes, specify: <br /> A. Number of one-way truck trips per day: Peak 30 - Average 20 <br /> B. Number of one-way truck trips per week: Peak 150 - Average 100 <br /> C. Primary public roads used for hauling: Kasson <br /> Describe proposed on-site and off-site road improvements: <br /> A. On-site Width 20, Surface Broken Tile <br /> Location: Haul road umned.iately around excavation will be extended from <br /> existing road now twenty (20) feet wide and surfaced <br /> with broken tile. <br /> B. Off-site Width 20' Surface Broken Tile <br /> Location <br /> Describe the mined material recovery process (type of process, method, size and <br /> type of crushing equipment) : <br /> Sand will be excavated by tracked scraper and front-end loader to a <br /> portable screening plant and then transferred to a stockpile. The screened <br /> materials will then be picked up and transferred to hi-way trucks for <br /> delivery to' construction locations. Screened reject will take the form <br /> of organic waste and a limited number of oversize gravel and river rock. <br /> The organic material will be destroyed each year as part of normal <br /> agricultural burning The oversize rock and gravel will be used to improve <br /> site roads and drainages. <br /> - Page 5 - <br />