Laserfiche WebLink
to the San Joaquin County Community <br /> Development Department and the homeowners <br /> association for purposes of monitoring <br /> compliance. <br /> K. An Evacuation Plan shall be prepared for this <br /> facility in accordance with the provisions of <br /> Chapter 23 , Division 2, of the Planning Title <br /> (Section 9-10324 (f) ) . <br /> L. All work on the levees shall be approved by <br /> the State Board of Reclamation (if required by <br /> the Board) and the Reclamation District, if <br /> applicable. <br /> M. Any dredging shall be approved by the Army <br /> Corps of Engineers. <br /> N. All structures in the flood plain shall be <br /> flood proofed per Section 9-10325 (3) (C) of the <br /> Planning Title. <br /> O. A landscape plan shall be submitted by the <br /> applicant and approved by the Development. <br /> Services Division prior to installation of the <br /> landscaping and initiation of new uses. <br /> P. A report from a California certified <br /> engineering geologist regarding soil <br /> stability, structural support, and design <br /> safety shall be prepared for each structure to <br /> be built. <br /> Q. Fuel and oil spill containment and cleanup <br /> materials shall be kept on hand in a <br /> convenient location. <br /> R. During construction of the campgrounds and <br /> campground facilities, the following <br /> conditions shall be followed: <br /> (1) All construction equipment shall be <br /> equipped with adequate mufflers. <br /> (2) Construction shall be done between 8 : 00 <br /> a.m. and 5: 00 p.m. <br /> (3) Construction within 200 feet of Tower <br /> Park Village shall be done between 10:00 <br /> a.m. and 3 : 00 p.m. <br /> S. An additional pump-out facility for boat <br /> R-91-741 -4- RV-88-26 <br />