My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013367
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
12 (STATE ROUTE 12)
>
14900
>
2600 - Land Use Program
>
RV-88-02
>
SU0013367
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:48:19 PM
Creation date
5/27/2020 9:02:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013367
PE
2600
FACILITY_NAME
RV-88-02
STREET_NUMBER
14900
Direction
W
STREET_NAME
STATE ROUTE 12
City
LODI
Zip
95242-
APN
05503009
ENTERED_DATE
5/22/2020 12:00:00 AM
SITE_LOCATION
14900 W HWY 12
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
to the San Joaquin County Community <br /> Development Department and the homeowners <br /> association for purposes of monitoring <br /> compliance. <br /> K. An Evacuation Plan shall be prepared for this <br /> facility in accordance with the provisions of <br /> Chapter 23 , Division 2, of the Planning Title <br /> (Section 9-10324 (f) ) . <br /> L. All work on the levees shall be approved by <br /> the State Board of Reclamation (if required by <br /> the Board) and the Reclamation District, if <br /> applicable. <br /> M. Any dredging shall be approved by the Army <br /> Corps of Engineers. <br /> N. All structures in the flood plain shall be <br /> flood proofed per Section 9-10325 (3) (C) of the <br /> Planning Title. <br /> O. A landscape plan shall be submitted by the <br /> applicant and approved by the Development. <br /> Services Division prior to installation of the <br /> landscaping and initiation of new uses. <br /> P. A report from a California certified <br /> engineering geologist regarding soil <br /> stability, structural support, and design <br /> safety shall be prepared for each structure to <br /> be built. <br /> Q. Fuel and oil spill containment and cleanup <br /> materials shall be kept on hand in a <br /> convenient location. <br /> R. During construction of the campgrounds and <br /> campground facilities, the following <br /> conditions shall be followed: <br /> (1) All construction equipment shall be <br /> equipped with adequate mufflers. <br /> (2) Construction shall be done between 8 : 00 <br /> a.m. and 5: 00 p.m. <br /> (3) Construction within 200 feet of Tower <br /> Park Village shall be done between 10:00 <br /> a.m. and 3 : 00 p.m. <br /> S. An additional pump-out facility for boat <br /> R-91-741 -4- RV-88-26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.