My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TURNPIKE
>
1601
>
2900 - Site Mitigation Program
>
PR0521845
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 4:17:12 PM
Creation date
5/28/2020 4:04:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0521845
PE
2950
FACILITY_ID
FA0014838
FACILITY_NAME
LOPEZ PROPERTY
STREET_NUMBER
1601
STREET_NAME
TURNPIKE
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
16504013
CURRENT_STATUS
01
SITE_LOCATION
1601 TURNPIKE RD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
455
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, � i w <br /> ti <br /> San Joaquin County DIRECTOR <br /> Donna Heran,REHS <br /> j <br /> P�U'" Environmental Health Department 1" ASSISTANT DIRECTOR <br /> 600 East Main Street Laurie Cotulla,REHS <br /> m Ills Stockton, California 95202-3029 PROGRAM COORDINATORS <br /> Carl Borgman,REHS <br /> Mike Huggins,REHS, RDI <br /> Website: www.sjgov.org/ehd Margaret Lagorio, REHS <br /> FPR Phone: (209) 468-3420 Robert McClellon, REHS <br /> Fax: (209)464-0138 Jeff Carruesco, REHS, RDI <br /> May 22, 2008 Kasey Foley, REHS <br /> Ms. Mabel Keir Ms. Nereida P. Lopez <br /> 1103 Grantland Court P. O. Box 6569 <br /> Modesto, California 95350 Stockton, California 95206 <br /> Subject: Lopez Properties <br /> 1601 Turnpike Road <br /> Stockton, California 95206 <br /> The San Joaquin County Environmental Health Department (EHD) has reviewed <br /> Additional Site Assessment Work Plan, dated May 2, 2008, submitted by Advanced <br /> GeoEnvironmental, Inc. (AGE) for the above-referenced site on your behalf. The work <br /> plan was submitted in response to the EHD letter dated February 7, 2008, directing <br /> additional investigation to define the vertical and lateral extent of petroleum hydrocarbon <br /> contamination for groundwater in the deeper zones. <br /> In the work plan, AGE proposes to advance one cone penetration test (CPT) boring <br /> (CPT-1) to approximately 180 feet below surface grade (bsg) in the former underground <br /> storage tank (UST) area to electronically characterize subsurface lithology and <br /> permeability units; based on this information, AGE proposes to advance approximately ten <br /> additional borings to collect depth-discrete groundwater samples. <br /> Grab groundwater samples are proposed to be collected from individual borings advanced <br /> adjacent to CPT-1 at depths greater than 120 feet bsg. It is proposed that the number of <br /> sampling borings will be determined based on petroleum hydrocarbon odor detected in the <br /> depth-discrete groundwater samples collected from borings adjacent to CPT-1. In addition, <br /> four sets of paired borings (B-4 through B-7) will be advanced at locations illustrated on <br /> Figure 2 of the work plan to collect grab groundwater samples at two unspecified, yet <br /> distinct depths determined by data collected during the advancement of CPT-1. Paired <br /> borings associated with B-5 will be advanced on the adjacent property at 1607 Turnpike <br /> Road, and the remainder of the borings will be advanced onsite. <br /> AGE proposes to conduct the proposed fieldwork in conjunction with fieldwork yet to be <br /> proposed by AGE for the adjacent property located at 1607 Turnpike Road, since it appears <br /> that the two sites share a co-mingled plume. However, AGE proposes to obtain an access <br /> agreement from the property owner at 1607 Turnpike Road for the advancement of B-5 <br /> paired borings since this scope of work is considered part of your site investigation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.