My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VIA NICOLO
>
17950
>
2900 - Site Mitigation Program
>
PR0516772
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2020 12:44:39 PM
Creation date
6/1/2020 12:23:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0516772
PE
2965
FACILITY_ID
FA0012793
FACILITY_NAME
MUSCO OLIVE LAND APP/TITLE 27
STREET_NUMBER
17950
Direction
W
STREET_NAME
VIA NICOLO
STREET_TYPE
RD
City
TRACY
Zip
95377
APN
20911032
CURRENT_STATUS
01
SITE_LOCATION
17950 W VIA NICOLO RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
893
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Messrs. Hall and Musco • - 2 - 8 May 2002 ' <br /> For the Stormwater Monitoring the following deficiency was noted: <br /> • The analyte pH was not reported. <br /> February 2002 Monitoring Report <br /> For the industrial wastewater monitoring requirements the following deficiencies were noted: <br /> • Biochemical Oxygen Demand(BOD) was not reported on a weekly basis. <br /> For the Wastewater Pond Monitoring the following deficiencies were noted: <br /> • Freeboard was not reported. <br /> • Dissolved oxygen in the pond was not reported. <br /> • Wastewater stored in other ponds (i.e. emergency pond or diesel pond)was not monitored. <br /> For the Land Application Area the following deficiencies were noted: <br /> • Hydraulic loading rate is described in hours of wastewater application and therefore does not allow <br /> calculation of BOD and TN loading rates. <br /> • The BOD loading rate for each land application area is not presented. <br /> • The TN loading rate for each land application area is not presented. In addition, the nitrate as <br /> nitrogen result was not included in the loading rate calculation. It is noted that the nitrate as nitrogen <br /> concentration was 782 mg/l. Omitting such a high concentration from the loading calculations <br /> results in substantially lower loading rates. <br /> • A map showing the land application areas was not included in the report. <br /> March 2002 Monitorine Report <br /> For the industrial wastewater monitoring requirements the following deficiencies were noted: <br /> • Biochemical Oxygen Demand (BOD)was not reported on a weekly basis. <br /> • Total coliform was not reported. <br /> For the Wastewater Pond Monitoring the following deficiencies were noted: <br /> • Freeboard was not reported. <br /> • Dissolved oxygen in the pond was not reported. <br /> • Wastewater stored in other ponds (i.e. emergency pond or diesel pond)not monitored. <br /> For the Land Application Area the following deficiencies were noted: <br /> • Hydraulic loading rate is described in hours of wastewater application that does not allow calculation <br /> of BOD and TN loading rates. <br /> • The BOD loading rate for each land application area is not presented. <br /> • The TN loading rate for each land application area is not presented. <br />
The URL can be used to link to this page
Your browser does not support the video tag.