Laserfiche WebLink
Musco Family Olive Company - 2 - 14 July 2014 <br /> Work Plan Addendum <br /> well casing and 20-feet of machine slotted well screen. These piezometers will be constructed <br /> such that they may be used to collect groundwater samples if needed in the future. <br /> Staff concurs with the need to move well MW-35 to a location east of the proposed Class II <br /> surface impoundments. Staff hopes that Musco is successful at finding groundwater in boring <br /> MW-35R at either of the two water bearing zones associated with wells MW-34 or MW-35 and <br /> are successful at finding groundwater at the proposed piezometer locations. If groundwater is <br /> not found at the anticipated depth, then Musco will immediately contact Board staff to discuss <br /> alternatives. <br /> By 15 August 2014, please provide a drilling schedule. If you have any questions please call <br /> me directly at 916-464-4737. <br /> Original Signed by <br /> TODD A. DEL FRATE, P.G <br /> Engineering Geologist <br /> WDR Compliance and Enforcement <br /> cc: Andrew Romolo, Terraphase Engineering Inc., Oakland <br />