Laserfiche WebLink
COMMENTS ON DEVELOPMENTS <br /> SA-92-27 <br /> 2 . Encroachment permit shall be required for work within road <br /> right-of-way. (Streets and Highway Title Section 10-3103) <br /> 3 . The Traffic Impact Mitigation Fee will be required for this <br /> development. The fee is due and payable at the time of <br /> building permit application. (The fee currently is $2 , 029. 00 <br /> per 1, 000 gross square foot of building as "Service Commercial" <br /> in the Lodi area. If there is no building permit required, <br /> the fee will be exempt. The fee shall be automatically <br /> adjusted July 1 of each year by the Engineering Construction <br /> Cost Index as published by the Engineering News Record. ) <br /> (Resolution R-90-304 , R-91-1025) <br /> 4 . Any additional run-off into the ditch along North 99 Frontage <br /> Road shall be retained on-site or metered. <br /> (Planning Title Section 9-10002) <br /> c: Manuel Lopez <br /> Deputy Director/Development <br />