Laserfiche WebLink
Timing or <br /> Person/ Frequency <br /> Monitoring Agency of <br /> Impact Mitigation Measure Requirements Responsible' Monitoring' <br /> 4.14-2(d) A Specific Plan for each phase of the project should be Review at each SP SJCCDD SP <br /> prepared and approved to ensure that industrial and stage. <br /> commercial job development does not occur later than as <br /> proposed by the project sponsor. A monitoring program <br /> should be implemented for each phase prior to approval of <br /> the next phase to ensure that the assumptions regarding the <br /> amount of internal travel remain valid. Monitoring is also <br /> addressed under Mitigation Measure 4.14-1 <br /> 4.14-3 The project would increase traffic 4.14-3(a) The project proponent should initiate and fund the Review at SP stage. SJCCDD: SP; PC <br /> volumes on adjacent freeway preparation of a Project Study Report for the I- SJCDPW; <br /> interchanges and require 205/Patterson Pass Road interchange prior to the first Caltrans <br /> interchange improvements. phase of development to identify the specific improvements <br /> that would be required. After improvements are identified. <br /> the project proponent should be required to fund the <br /> project's fair share of the needed improvements. Additional <br /> tutu lanes and other ramp interchange improvements should <br /> 3 be constructed as necessary based on the phasing plan <br /> adopted for the project, including a partial cloverleaf <br /> interchange at Patterson Pass/I-205. The Project Study <br /> Report prepared for improvements at this interchange <br /> should identify specific lane, tum storage, and signalization <br /> needs for each development base. <br /> 4.14-3(b) Additional freeway interchanges in the area, such as Review at SP stage. SJCCDD; SP <br /> Grant Line Road/1-580 and 11th Street/I-205, should be SJCDPW <br /> studied in more detail when a Specific Plan is prepared <br /> for the second phase of the project or earlier. If the <br /> Specific Plan indicates the need, the project sponsor may <br /> also be required to initiate and prepare a Project Study <br /> Report for these two additional interchanges dash prior <br /> to the second phase of development. The-possibility 4 <br /> reE}�++ staadYr <br /> SJCCDD: San Joaquin County Community Development Deparhncnt; SJCBD:San Joaquin County Building Division;SJCDPW San.loaquin County Department of Puhlic Works; USACE: U.S.Arnty Corps <br /> of Engineers; SJCI-CI:: San.loaquin County Flood Control Fnginecr: CSD:Community Services District(of project); RWQCB: Regional Water Quality Control Board;CDFG: California Department of Fish <br /> and Game;S.ICEI ID:San Joaquin County Environmental l lcalth Department; DI IS:California Department of Health Services;LAFCO:Local Agency Formation Commission. 'Ihosc responsible would maintain <br /> monitoring records and verify compliance with mitigation measure. <br /> ' GPA: General Plan Amendment stage; SP: Specific Plan stage: PC: Pre-construction stage: (includes "Tentative Map approval OF and Final Map approvals and other discretionary application <br /> approvals). -- Construction stage (prior to building permit issuance); O: Operational stage. <br />