Laserfiche WebLink
incorporated into an operations and Maintenance <br /> Manual for the storm water collection system. <br /> • Adequate access must be ensured for maintenance of <br /> all detention basins . Pond layouts must be provided <br /> in the Specific Plan. <br /> • See FEIR, Section 4 . 4 . 3 . <br /> K-5 . Potentially Significant Impact • Phasing Impacts on BBID <br /> [ Impact 4 . 4 . 3-51 <br /> Construction of the Project in phases could interfere <br /> with the operations of BBID' s water distribution canals , <br /> agricultural tile drains, and surface drainage channels . <br /> Finding : Changes or alterations have been required in, <br /> or incorporated into, the Project which avoid or <br /> substantially lessen the significant environmental effect <br /> as identified in the FEIR to a non-significant level . <br /> These mitigation measures are listed below. <br /> Statement of Fact : The impact will be reduced by the <br /> following : <br /> • The Project must be designed and constructed such <br /> that BBID operations are not interrupted. The <br /> Specific Plan must address how this is to be <br /> accomplished. <br /> • See FEIR, Section 4 . 4 . 3 . <br /> L. GAS AND ELECTRICITY <br /> L-1 . Potentially Significant Impact • PG&E Restrictions <br /> [Impact 4 . 4 . 4-11 <br /> The proposed land use plan appears to violate PG&E <br /> restrictions for uses within electrical ttansmission line <br /> and natural gas pipeline easements and does not provide <br /> adequate corridors for planned utility easements . <br /> Finding: Changes or alterations have been required in, <br /> or incorporated into, the Project which avoid or <br /> substantially lessen the significant environmental effect <br /> as identified in the FEIR to a non-significant level . <br /> These mitigation measures are listed below. <br /> C2-26 <br /> 0189r/0202r <br />