My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013380
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
0
>
2600 - Land Use Program
>
GP-89-11
>
SU0013380
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2020 4:22:18 PM
Creation date
6/2/2020 4:07:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013380
PE
2600
FACILITY_NAME
GP-89-11
STREET_NUMBER
0
STREET_NAME
PATTERSON PASS
STREET_TYPE
RD
City
TRACY
Zip
95376-
APN
20904003
ENTERED_DATE
5/29/2020 12:00:00 AM
SITE_LOCATION
PATTERSON PASS RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Statement of Fact : The impact will be reduced by the <br /> following : <br /> • The Applicant must formally apply to PG&E to relocate <br /> and underground the Weber-Herdlyn 60 kV electrical <br /> transmission line and to relocate the eight-inch <br /> natural gas pipeline. Preliminary responses and cost <br /> estimate from PG&E must be secured and documented in <br /> the Specific Plan. <br /> • An adequate open space corridor or appropriate land <br /> use plan which meets PG&E approval must be provided <br /> for the Rio Oso-Tesla and proposed Rancho Seco-Tesla <br /> transmission line corridors (see FEIR, Section 4 . 12 , <br /> Public Health and Safety section) . PG&E ' s approval <br /> must be secured and documented in the Specific Plan. <br /> • Development within electrical overhead transmission <br /> easements must not restrict access to the towers or <br /> interfere with the tower footings or wires, and must <br /> receive prior approval from PG&E. Development in <br /> easements associated with buried pipelines must not <br /> disturb soil cover over the pipelines, and must <br /> receive prior approval from PG&E or other owners of <br /> easements . <br /> • The Applicant must submit construction plans to PG&E <br /> for review. In particular, the proposed land uses in <br /> PG&E easements and movement of heavy machinery over <br /> the Line No . 2 gas pipeline should be addressed. <br /> PG&E' s approval should be secured and documented in <br /> the Specific Plan. <br /> • See FEIR, Section 4 . 4 . 4 . <br /> L-2 . Potentially Significant Impact • Energy Demand <br /> [Impact 4 . 4 . 4-21 <br /> The Project would have a significant energy demand and <br /> would contribute to the depletion of non-renewable <br /> resources and the demand for environmentally-detrimental <br /> renewable resources such as hydroelectric power . <br /> Finding : Changes or alterations have been required in, <br /> or incorporated into, the Project which avoid or <br /> substantially lessen the significant environmental effect <br /> as identified in the FEIR to a non-significant level . <br /> These mitigation measures are listed below. <br /> C2-27 <br /> 0189r/0202r <br />
The URL can be used to link to this page
Your browser does not support the video tag.