Laserfiche WebLink
0-8 . Potentially Significant Impact • Levee Erosion <br /> [ Impact 4 . 7-81 <br /> Increased boating within Old River and South Delta <br /> waterways , expected as the result of the operation of the <br /> proposed marina, would contribute to the erosion of <br /> levees by waves generated as boat wakes . <br /> Finding : Changes or alterations have been required in, <br /> or incorporated into, the Project which avoid or <br /> substantially lessen the significant environmental effect <br /> as identified in the FEIR to a non-significant level . <br /> These mitigation measures are listed below. <br /> Statement of Fact : The impact will be mitigated by the <br /> following : <br /> • The design of the levee improvement mitigations will <br /> mitigate the potential for all causes of erosion, <br /> including boat wakes . Possible design components for <br /> the prevention of erosion would include rock <br /> revetment structures , such as riprap. Specific <br /> design components for the erosion abatement must be <br /> required by the San Joaquin County Flood Control <br /> Engineer as a condition of levee design approval . <br /> • To mitigate the impact of boat wakes on the stability <br /> of levees outside the control of the Project, boat <br /> speed limits to reduce the generation of potentially <br /> damaging boat wakes must be established and enforced <br /> by the San Joaquin County Sheriff ' s Department, <br /> Boating Safety Division, in conjunction with other <br /> Delta area law enforcement agencies . <br /> • See FEIR, Section 4 . 7 . <br /> P. VISUAL QUALITY <br /> P-1 . potentially Significant Impact • Alteration of Rural <br /> Visual Quality <br /> [Impact 4 . 8-11 <br /> The Project would replace a 4 , 667-acre agricultural <br /> portion of San Joaquin County with a built environment, <br /> and would significantly alter the existing rural visual <br /> quality of the site as seen from local roads . <br /> Finding : Changes or alterations have been required in, <br /> or incorporated into, the Project which avoid or <br /> substantially lessen the significant environmental effect <br /> as identified in the FEIR to a non-significant level . <br /> These mitigation measures are listed below. <br /> C2-41 <br /> 0189r/0202r <br />