Laserfiche WebLink
protection should be incorporated into the Specific <br /> Plan . <br /> • See FEIR, Section 4 . 13 ; see also FEIR, Section 4 . 7 <br /> (Hydrology and Water Quality impact mitigations) . <br /> V. TRANSPORTATION <br /> V- 1 . Potentially Significant Impact • Adjacent Freeway <br /> Interchanges <br /> [ Impact 4 . 14-31 <br /> The Project would increase traffic volumes on adjacent <br /> freeway interchanges and require interchange improvements . <br /> Finding : Changes or alterations have been required in, <br /> or incorporated into , the Project which avoid or <br /> substantially lessen the significant environmental effect <br /> as identified in the FEIR to a non-significant level . <br /> These mitigation measures are listed below. CalTrans <br /> would share responsibility for these measures . <br /> Statement of Fact : The impact will be reduced by the <br /> following : <br /> • The Applicant must initiate and fund the preparation <br /> of a Project Study Report for the I-205/Patterson <br /> Pass Road interchange prior to the first phase of <br /> development to identify the specific improvements <br /> that would be required. After improvements are <br /> identified, the Applicant will be required to fund <br /> the Project ' s fair share of the needed improvements . <br /> Additional turn lanes and other ramp interchange <br /> improvements must be constructed as necessary based <br /> on the paving plan adopted for the Project , including <br /> a partial cloverleaf interchange at Patterson <br /> Pass/I-205 . The Project Study Report prepared for <br /> improvements at this interchange must identify <br /> specific lane, turn storage, and signalization needs <br /> for each development phase. <br /> • Additional freeway interchanges in the area, such as <br /> Grant Line Road/I-508 and 11th Street/I-205 , should <br /> be studied in more detail when a Specific Plan is <br /> prepared for the second phase of the Project or <br /> earlier . If the Specific Plan indicates the need, <br /> the Project sponsor may also be required to initiate <br /> and prepare a Project Study Report for these two <br /> additional interchanges prior to the second phase of <br /> development . <br /> C2-65 <br /> 0189r/0202r <br />