Laserfiche WebLink
1 <br /> r <br /> i <br /> k\ <br /> b. Penta is mixed inside retorts <br /> 3. Containerized Chemicals <br /> (kept,in roofed and paved storage shed by entrance.) <br /> a. 55 gallon drums of PCP <br /> b. 80 and 100 bags of "Flamescape" <br /> c. 55 gallon drums of Copper Oxide <br /> d. Bags of Zinc Oxide <br /> e. Bags of Ammonium Bicarbonate <br /> 4. Chemical Loading Areas <br /> a. Bulk liquid chemical deliveries by truck and railcar <br /> (to tanks) . <br /> b. Container chemical deliveries by truck (to storage shed) . <br /> 5. Chemical Piping <br /> C. Spill prevention Staff and Equipment <br /> 1. Staff <br /> a. Ed Marain, Treating Supervisor (responsible for spill <br /> A prevention control.) <br /> b. Three full-time equipment maintenance personnel. <br /> c. Ten operations personnel available if needed. <br /> 2. Equipment <br /> a. Front-end loader <br /> b. Four"Pettibone" log loaders and four forklifts <br /> c. Ten shovels, four brooms <br /> d. . Five cubic yards of bulk absorption material <br /> e. 200+ empty 35 and 55 gallon drums <br /> f. One diesel, 5 HP self-priming pump (rental) <br /> g. One gasoline HP self-priming pump <br /> h. One electric HP submersible pump <br /> i. Fire extinguishers located throughout site maintained <br /> on a scheduled basis <br /> j. Fire hoses located throughout site <br /> k. Hand held mobile FM Radio units (9) <br /> 1. Intercom and telephones throughout site <br /> m. External alarm system <br /> n. Water and steam cleaners <br /> X-25 <br />