Laserfiche WebLink
Mar 02 09 07:23a JP Pet oleum Service 916372 873 p.4 <br />SWRCB, January 2002 <br />Page of <br />Test Method Developed By: X Piping Manufacturer 3 Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: X Pressure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: Pressure Gauge Equipment Resolution: 0-15 PSI <br />Piping Run # 1 <br />Piping Material: Fiberglass <br />Piping Run # 2 <br />Fiberglass <br />Piping Run # 3 <br />Fiberglass <br />Piping Run # <br />Piping Manufacturer: Smith <br />Smith <br />Smith <br />Piping Diameter: 3" <br />3" <br />3" <br />Length of Piping Run: 150' <br />150' <br />150' <br />Product Stored: Regular <br />Plus <br />Premium <br />Method and location of Test boot <br />piping -run isolation- <br />Test boot <br />Test boot <br />Test boot <br />Wait time between applying <br />pressure/vacuum/water and 5 min <br />starting test: <br />5 min <br />5 min <br />5 min <br />Test Start Time: 9:10 <br />8:40 <br />8:35 <br />Initial Reading (R): 5 PSI <br />5 PSI <br />5 PSI <br />Test End Time: 10:10 <br />9:40 <br />9:35 <br />Final Reading (RF): 5 PSI <br />5 PSI <br />5 PSI <br />Test Duration: 30 min <br />30 min <br />30 min <br />30 min <br />Change in Reading (RF-Rj): 0 <br />0 <br />0 <br />Pass/Fail Threshold or 0 drop <br />Criteria: <br />0 drop <br />0 drop <br />0 drop <br />Test Result: x Pass ❑ ]Fail <br />x Pass ❑ Fail <br />x Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Comments — (include information on repairs made prior to testing and recommended fo1[ow-up for failed tests) <br />