Laserfiche WebLink
5. UNDER -DISPENSER CONTAINMENT UDC TESTING <br />Test Method Developed By: ❑ UDC Manufacturer Z Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: ❑ Pressure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: Incon Sump Tester Equipment Resolution: +/- 0.002" <br />UDC Manufacturer: <br />UDC #7/8 <br />UDC Material: <br />UDC Depth: <br />Height from UDC Bottom to Top <br />of Highest Piping Penetration: <br />Height from UDC Bottom to <br />Lowest Electrical Penetration: <br />Condition of UDC prior to <br />testing: <br />Portion of UDC Tested <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />product and water)?* <br />Turbine shutdown response time <br />Is system programmed for fail- <br />safe shutdown?* <br />Was fail-safe verified to be <br />operational?' <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test <br />Test Start Time: <br />Initial Reading (RI): <br />Test End Time: <br />Final Reading (RF): <br />Test Duration: <br />Change in Reading (RF -R,): <br />Pass/Fail Threshold or Criteria: <br />+/- 0.002" <br />Test Result: <br />0 Pass 0 Fail <br />Was sensor removed for testing? <br />❑ Yes ® No ❑ NA <br />Was sensor properly replaced and ❑ yes ❑ No Z NA <br />verified functional after testin ? <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />"Sensor functionality was not confirmed. This procedure is not part of the Secondary Containment testing scope of work". <br />Visual Fail — Torn Conduit Boot in UDC ## 7/8. <br />' If the entire depth of the UDC is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />