Laserfiche WebLink
TEST NO.2 - SPILL/OVERFILL CONTAINMENT BOXES <br />Pae 1 of 2 <br />Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br />Spill/Overfill Containment Boxes are Present, but were Not Tested ❑ <br />Test Method Developed By: ❑ Spill Bucket Manufacturer 21 Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: ❑ Pressure ❑ Vacuum O Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: Incon Tester <br />Equipment Resolution: <br />Spill Box #87-1 fill <br />Spill Box #87-1 vap <br />Spill Box #87-2 fill <br />Spill Box #87-2 vap <br />Bucket Diameter: <br />5 gal <br />5 gal <br />5 gal <br />5 gal <br />Bucket Depth: <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: Per Protocol <br />Test Start Time: <br />9:17am <br />10:17am <br />9:37am <br />10:17am <br />Initial Reading (RI): <br />3.2431 <br />3.9772 <br />3.3265 <br />4.0735 <br />Test End Time: <br />9:32am <br />10:32am <br />9:52am <br />10:32am <br />Final Reading (RF): <br />3.2430 <br />3.9772 <br />3.3146 <br />4.0731 <br />Test Duration: <br />15 min. <br />15 min. <br />16 min. <br />15 min. <br />Change in Reading (RF- <br />RI <br />-,0001 <br />none <br />-.0119 <br />-.0004 <br />Pass/Fail Threshold or <br />Criteria• <br />3rd Party Certified <br />3rd Party Certified <br />0.002 in. <br />3rd Party Certified <br />Twit ResuXt� ,, <br />Pas`s.` ❑Fail <br />®Pass , : Fail . ; <br />❑; Pass ® Fail . <br />® Pass ❑ Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />