Laserfiche WebLink
TEST NO.2 - SPILL/OVERFILL CONTAINMENT BOXES <br />Pae 2 of 2 <br />Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br />Spill/Overfill Containment Boxes are Present, but were Not Tested ❑ <br />Test Method Developed By: ❑ Spill Bucket Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: ❑ Pressure ❑ Vacuum El Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: Incon Tester <br />Equipment Resolution: <br />Spill Box #87-3 fill <br />Spill Box #87-3 vap <br />Spill Box #91 fill <br />Spill Box #91 vap <br />Bucket Diameter: <br />5 gal <br />5 gal <br />5 gal <br />5 gal <br />Bucket Depth: <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: Per Protocol <br />Test Start Time: <br />9:17am <br />10:17am <br />9:37am <br />10:17am <br />Initial Reading (RI): <br />3.2103 <br />3.5663 <br />3.2202 <br />0.3473 <br />Test End Time: <br />9:33am <br />10:32am <br />9:52am <br />10:32am <br />Final Reading (RF): <br />3.2104 <br />3.5661 <br />3.2200 <br />0.0510 <br />Test Duration: <br />16 min. <br />15 min. <br />15 min. <br />15 min. <br />Change in Reading (RF- <br />RI <br />+.0001 <br />-.0002 <br />-.0002 <br />-0.2963 <br />Pass/Fail Threshold or <br />Criteria: <br />3rd party Certified <br />3`d Party Certified <br />3`d Party Certified <br />0.002 in. <br />Te'stResult. <br />O Pass:., ❑Fail®Pass <br />13 Fail <br />® Pass - ❑ Fail <br />❑ PassO Fail <br />Comments —(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />