My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1700
>
2300 - Underground Storage Tank Program
>
PR0231454
>
COMPLIANCE INFO_2007-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2023 11:52:51 AM
Creation date
6/3/2020 9:49:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2018
RECORD_ID
PR0231454
PE
2361
FACILITY_ID
FA0003796
FACILITY_NAME
Manteca Valero
STREET_NUMBER
1700
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22802002
CURRENT_STATUS
01
SITE_LOCATION
1700 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231454_1700 E YOSEMITE_2007-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
466
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />5. SECONDARY PIPE TESTING <br />Page of <br />Test Method Developed By: <br />X Piping Manufacturer ❑ Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: <br />X Pressure <br />❑ Other (Spec) <br />❑ Vacuum ❑ Hydrostatic <br />Test Equipment Used: Pressure Gauges in PSI/Nitrogen <br />Equipment Resolution: 1/10-15 PSI <br />Piping Run #l. <br />MEMO= BEE <br />Piping Run #2 Piping Run # Piping Run <br />Piping Material: <br />Fiberglass <br />Fiberglass <br />Piping Manufacturer: <br />Smith <br />Smith <br />Piping Diameter: <br />3" <br />3" <br />Length of Piping Run: <br />Approx. 115' <br />Approx. 125' <br />Product Stored: <br />Regular 87 <br />Super 91 <br />Method and location of <br />piping -run isolation: <br />Test boot at STP#1 <br />Test boot at STP#2 <br />Wait time between applying <br />pressure and starting test: <br />30 Minutes <br />30 Minutes <br />Test Start Time: <br />2:10 <br />2:20 <br />Initial Reading (Ri): <br />5 PSI <br />5 PSI <br />Test End Time: <br />3:10 <br />3:20 <br />Final Reading (RF): <br />5 PSI <br />5 PSI <br />Test Duration: <br />1 Hour <br />1 Hour <br />Change in Reading (RF -R,): <br />0 PSI <br />0 PSI <br />Pass/Fail Threshold or <br />Criteria: <br />No Loss in PSI <br />No Loss in PSI <br />II Test Result: I X Pass ❑ Fail I X 'Pass ❑ Fail I Pass 0 Fail I Pass Pail __I <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />Page 3 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.