Laserfiche WebLink
SWRCB, January 2002 <br />5. SECONDARY PIPE TESTING <br />Page of <br />Test Method Developed By: <br />X Piping Manufacturer ❑ Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: <br />X Pressure <br />❑ Other (Spec) <br />❑ Vacuum ❑ Hydrostatic <br />Test Equipment Used: Pressure Gauges in PSI/Nitrogen <br />Equipment Resolution: 1/10-15 PSI <br />Piping Run #l. <br />MEMO= BEE <br />Piping Run #2 Piping Run # Piping Run <br />Piping Material: <br />Fiberglass <br />Fiberglass <br />Piping Manufacturer: <br />Smith <br />Smith <br />Piping Diameter: <br />3" <br />3" <br />Length of Piping Run: <br />Approx. 115' <br />Approx. 125' <br />Product Stored: <br />Regular 87 <br />Super 91 <br />Method and location of <br />piping -run isolation: <br />Test boot at STP#1 <br />Test boot at STP#2 <br />Wait time between applying <br />pressure and starting test: <br />30 Minutes <br />30 Minutes <br />Test Start Time: <br />2:10 <br />2:20 <br />Initial Reading (Ri): <br />5 PSI <br />5 PSI <br />Test End Time: <br />3:10 <br />3:20 <br />Final Reading (RF): <br />5 PSI <br />5 PSI <br />Test Duration: <br />1 Hour <br />1 Hour <br />Change in Reading (RF -R,): <br />0 PSI <br />0 PSI <br />Pass/Fail Threshold or <br />Criteria: <br />No Loss in PSI <br />No Loss in PSI <br />II Test Result: I X Pass ❑ Fail I X 'Pass ❑ Fail I Pass 0 Fail I Pass Pail __I <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />Page 3 of 7 <br />