My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
341
>
2300 - Underground Storage Tank Program
>
PR0231477
>
COMPLIANCE INFO_2006-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2023 4:34:13 PM
Creation date
6/3/2020 9:50:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2018
RECORD_ID
PR0231477
PE
2361
FACILITY_ID
FA0003753
FACILITY_NAME
RIPON SHELL*
STREET_NUMBER
341
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
26114007
CURRENT_STATUS
01
SITE_LOCATION
341 E MAIN ST
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231477_341 E MAIN_2006-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
548
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 SECTION 11.2 FUEL PUMP AND DISPENSER INSTALLATION <br />Drautngs, and the Contractor shall check space allotment, foundations, and other like items to <br />ascertain that there are no interferences. The Contractor shall notify the owners rep., regarding <br />any discrepancies or installation difficulties disclosed. Additional costs incurred by the <br />Contractor's failure to report such discrepancies shall be bome by the Contractor <br />B. Before placement of equipment, the Contractor shall check concrete embedded items and <br />anchor bolts, and where severe misalignments occur, adjustment of such misaiignments shall be <br />subiect to the approval of the Engineer. <br />C. Anv deviation from the Drawings and, -or Specifications shall be subject to prior ",ntten <br />approval of the Engineer. <br />.02 INSTALLATION <br />A. The Contractor shall install equipment in strict accordance with the manufacturer's drawings, <br />tolerances, instructions, and recommendations, <br />B. \Vhen necessary, services of manufacturer's representatives, engineers, or installers will be <br />made available for installing mechanical equipment. Such services shall be requested by the <br />Contractor sufficiently in advance to allow ample time for approval and procurement. Additional <br />costs incurred by the Contractor's failure to properly schedule such services shall be borne by the <br />Contractor. <br />C. The Contractor shall position the equipment, shim to level, properly align components, and <br />tighten anchors. Prior to assembling equipment components or connecting external piping, ducts, <br />and other like items, the Contractor shall thoroughly inspect the equipment internally for damage <br />or defects, remove foreign materials, and clean piping assemblies. <br />D. ,after completing external connections to piping and other like items. the Contractor shall <br />ensure that equipment alignment is within the stated tolerances and that stresses from external <br />connections do not exceed equipment manufacturer's limits. <br />E. The Contractor shall lubricate all equipment in accordance with the manufacturer's <br />instructions and in keeping with accepted engineering practice. The Contractor shall flush clean <br />all equipment components requiring lubricant, but shipped "dry. The Contractor shall completely <br />flush oil supply and return piping, drain the flushings, clean the oil reservoirs, add the specified <br />lubricant, and purge the supply piping prior to connecting to the equipment. <br />F. The Contractor shall be responsible for subsystem assemblage to equipment requiring field <br />assembly. <br />709s1124 4 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.