Laserfiche WebLink
J'an. 19. 2009 1 : 09PM West Star E n v i r o n m e n t a 1, 1 n c. No. 7703 P. 4/7 Page 3 of <br /> ziwkLL;ks.January yUU2 <br /> 5. SECONDARY PIPE TESTTP <br /> Test Method Developed By: Piping MamLfactu= Industry Standard Professional Engineer <br /> Other(Specify) CSWRB <br /> Test Method Used: Pressure Vacuum Hy tic <br /> Other(Specify) x <br /> Test Equipment Used: INCON STS Equipment Resolution: .002 <br /> Piping Ran#uma-- Piping Run#uratMn Piping Run# <br /> Piping Run# <br /> Piping Material; PLASTIC <br /> Piping Manufacturer, APT/LINES <br /> Piping Diameter: 21N <br /> Length of Piping Run: 4OFT <br /> Product Stored; GASOLINE <br /> Method and locib'op'of <br /> piping-run isolation- SUMPS/PANS <br /> Wait time 5awe-wapp lyung <br /> pressure/vacmim/water and <br /> starting test: 5MJN <br /> Test Start Time: 10-30 <br /> Initial Reading(R1): 5PS1 <br /> Test End Time: 11:30 <br /> Final Reading(RF); 5PST <br /> Test Duration: lHR, <br /> Change in Reading(RF-Rl,): OpSI <br /> Pas Mil Threshold or <br /> Criteria: No drop in Pr8ssure No drop in pressure No drop In pr re Nod in pressure <br /> Test Result: <Pass Faif Pa FailPass C, Fad Pass Fail <br /> Comments-(include information on repairs made prior to testing, and recommended follow-up for failed tests)RUN#1 IS <br /> FROMBOTH SUMPS TO DISPENSER 7&8/RIJN#2 IS FROM BOTH SUMPS TO 3&4/RUN#3 IS FROM 3&4 TO 1&2/RUN#4 IS <br /> FROM 1&2 TO 5&6 <br />