Laserfiche WebLink
SWRCB,January 2002 Page 3 of -7 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer W'Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: XPressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Z)- 15 Equipment Resolution: <br /> Piping Run# 81 Piping Run# 1 Piping Run# Piping Run# <br /> Piping Material: p, <br /> Piping Manufacturer: <br /> Piping Diameter: 1 r <br /> Length of Piping Run: <br /> Product Stored: <br /> Method and location of •-reSf, P� "f �p 5-f E"�f„-f <br /> piping-run isolation: a QHS( t��f iN -� Te <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: I A 0 0 Cr. /IS" <br /> Initial Reading(R,): <br /> Test End Time: ; <br /> Final Reading(RF): <br /> Test Duration: �.r <br /> Change in Reading(RF-R): y- <br /> Pass/Fail Threshold or <br /> Criteria: Alo4e, c 's <br /> D Fall � ., ,Pass,,����Ratl•k • �D aSS�, ❑Pail ❑ �'tiS�: 4 Fail <br /> -Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> I <br /> 1 <br /> I <br /> : <br /> I <br /> i <br /> i <br />