Laserfiche WebLink
ec(R� <br /> Page 5 of 8 <br /> €e�,eeaeeaadt,uec <br /> 7. UNDER-DISPENSER CONTAINMENT(UDQ TESTING <br /> Test Method Developed By: ❑UDC Manufacturer ®Industry Standard ❑Professional Engineer <br /> ❑ Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum ®Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Level Change Indicator Equipment Resolution: 0.0025 <br /> UDC#1-2 UDC#3-4 UDC#5-6 UDC#7-8 <br /> UDC Manufacturer: Bravo Bravo Bravo Bravo <br /> UDC Material: Steel Steel Steel Steel <br /> UDC Depth: 10 in 10 in 10 in 10 in <br /> Height from UDC Bottom to Top 0 in 0 in 0 in 0 in <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to 0 in 0 in 0 in 0 in <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to Dry Dry Dry Dry <br /> testing: <br /> Portion of UDC Tested 8"above prod.piping 8"above prod.piping 8"above prod.piping 8"above prod.piping <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both ❑Yes❑No®NA [-]Yes❑No®NA ❑Yes[:]No®NA [-]Yes❑No®NA <br /> product and water)?* <br /> Turbine shutdown response time *See comments *See comments See comments "See comments <br /> Is system programmed for fail- <br /> safe shutdown? ❑Yes[:]No®NA ❑Yes[:]No®NA [-]Yes❑No®NA ❑Yes[:]No®NA <br /> Was fail-safe verified to be <br /> ❑ <br /> operational?* ❑ <br /> Yes No®NA ❑Yes[—]No®NA [:]Yes[:]No®NA [-]Yes❑No®NA <br /> Wait time between applying 5 min 5 min 5 min 5 min <br /> pressure/vacuum/water and <br /> starting test <br /> Test Start Time: 9:40 AM 9:35 AM 9:45 AM 9:30 AM <br /> Initial Reading(RI): 0 0 0 0 <br /> Test End Time: 10:10 AM 10:05 AM 10:15 AM 10:00 AM <br /> Final Reading(RF): 0 0 0 0 <br /> Test Duration: 30 min 30 min 30 min 30 min <br /> Change in Reading(RF-RI): 0 0 0 0 <br /> Pass/Fail Threshold or Criteria: 0.0025 0.0025 0.0025 0.0025 <br /> Test Result: M Pass ❑Fail M Pass ❑Fail ® Pass ❑Fail N Pass ❑Fail <br /> Was sensor removed for testing? ❑Yes❑No®NA [—]Yes❑No®NA ❑Yes❑No®NA ❑Yes[—]No®NA <br /> Was sensor properly replaced and <br /> verified functional after testing? [—]Yes❑No®NA ❑Yes❑No®NA ❑Yes[-]No®NA ❑Yes❑No®NA <br /> Comments—(include information on repairs made prior to testing, and recommended ollow-u or ailed tests) <br /> ug ; <br /> r <br /> F N '[0 D <br /> T <br /> = _ <br /> If the entire depth of the UDC is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />