My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HOSPITAL
>
500
>
2300 - Underground Storage Tank Program
>
PR0231614
>
COMPLIANCE INFO_2006-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2021 1:21:17 PM
Creation date
6/3/2020 9:50:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2012
RECORD_ID
PR0231614
PE
2361
FACILITY_ID
FA0000086
FACILITY_NAME
San Joaquin General Hospital
STREET_NUMBER
500
Direction
W
STREET_NAME
HOSPITAL
STREET_TYPE
Rd
City
French Camp
Zip
95231
CURRENT_STATUS
01
SITE_LOCATION
500 W Hospital Rd
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231614_500 W HOSPITAL_2006-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
368
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br /> BAGLEY ENTERPRISES., INC. RECENED <br /> LIQUID HANDLING SOLUTIONS- MAY 2 8 2009 <br /> 2370 Maggio Circle, Unit 44, Lodi, CA 95240-8828 ENVIRONMENT HEALTH <br /> T#: (209)3674800/F#: (209)367-5424 PERNAITISERVICES <br /> Contractor's License#774802 <br /> May 27,2009 <br /> San Joaquin County <br /> Environmental Health Department <br /> 600 E. Main street <br /> Stockton, CA 95202-3029 <br /> Attn: Michelle Henry, REHS <br /> Senior Registered Environmental Health Specialist <br /> Re: SR0056930 <br /> As requested,please consider this letter as an updated scope of work. Our intentions are as <br /> follows: <br /> 1) Cut the secondary piping,being careful not to disturb the primary piping,at a point <br /> approximately 24 "away from the turbine sump. <br /> 2) Loosen the sump termination fitting allowing us to slide the secondary piping into the <br /> turbine sump until the all of the cracked piping is inside the sump. <br /> 3) Inside the sump....cut off the exposed cracked secondary piping. <br /> 4) Outside the sump—Anstall a"Y sleeve coupling".P/N 012030-101-3,over the <br /> secondary containment piping to connect the two loose ends together. <br /> 5) Retighten sump termination fitting. <br /> 6) Air test the secondary containment line. <br /> 7) Lake test the sump. <br /> 8) Schedule and coordinate third party precision testing of tank and primary and secondary <br /> piping. <br /> 9) A"Certification of Installation/Modification"form will be submitted upon completion. <br /> Note: All parts used are UL listed and all work and testing will be accomplished in accordance <br /> with manufacturer's guidelines(see enclosed brochures and spcc sheets from NOV Fiber Glass <br /> Systems (previously known as"Smith Fiberglass"). <br /> Please call at your earliest opportunity with any questions you may have. Thank you for your <br /> patience. <br /> Sincerely, <br /> Jo p ag ey <br /> G eral Manager <br /> Encl(s):NOV Fiber Glass Systems brochures/Personnel ICC&Mfg Certs/Site photos <br />
The URL can be used to link to this page
Your browser does not support the video tag.