Laserfiche WebLink
RY <br /> I <br /> C <br /> Test Method sy. o.Manufacturer <''® !nclustry Standard b Rrofesslonal Engr o Other(see below) <br /> Test Method Uses ® eressure. i o Vacuum o'Hydrostatic o Other(see below) <br /> Measuring ui ment Used. Pressure Gauge (range 6 to 15 psig) ; <br /> Description Line#9 Line 2 Line#377777 <br /> Tank product Gasoline-87 Gasoline-91 Diesel <br /> Pipe manufacturer Ameron Ameron Ameron <br /> Ripe material FRP FRP FRP <br /> Primary pipe diameter (nches) 2 2 3 <br /> Secondary pipe diameter (inches) 3 3 4 <br /> Method of secondary pipe isolation Termination Boot Termination Boot Termination Boot <br /> Location of secondary pipe isolation SumpSump Sump <br /> Estimated length of piping run (feet) 11080 130 <br /> (include length of branch runs) <br /> Wait time for pressure to stabilize (hrmin) :10 :10 :10 <br /> f 'est start time 10:10 AM 10:30 AM 10:44 AM <br /> Initial pressure (psig) 5.0 5.0 5.0 <br /> Test end time 11:10 AM 11:40 AM 11:44 AM <br /> Final pressure(psig) 5.0 0.0 5.0 <br /> Test duration (hr:min) 1:00 1:10 1:00 <br /> Change in pressure (psig) 0.0 5.0 0.0 <br /> Pass/Fail threshold (psig) 0.5 0.5 0.5 <br /> TEST RESULT PASS FAIL PASS <br /> Comments: <br /> 0 2015 Walton Engineering,Inc. <br />