My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MOFFAT
>
983
>
2300 - Underground Storage Tank Program
>
PR0231691
>
COMPLIANCE INFO_2010-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2023 4:58:56 PM
Creation date
6/3/2020 9:50:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2015
RECORD_ID
PR0231691
PE
2361
FACILITY_ID
FA0003593
FACILITY_NAME
Nella Oil #487
STREET_NUMBER
983
STREET_NAME
MOFFAT
STREET_TYPE
Blvd
City
Manteca
Zip
95336
APN
221-15-06
CURRENT_STATUS
01
SITE_LOCATION
983 Moffat Blvd
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231691_983 MOFFAT_2010-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
410
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. <br /> ROPUCTR G: TES I <br /> Um <br /> Test Method By: :. 0 Manufacturer. 0ndustry standard . :o Professional Ehgr:.o.Other(see.below) <br /> Test Method Uses: 0 Pressure O Vacuum . Hydrostatic O Qtilet (548 below) <br /> Measuring equipment Used. INCQN rTS-STS '(Siectronic Sump Test Systein) <br /> Descri tion <br /> Tanis#9 Tank#2 Tank#3. <br /> Tank product Gasoline-87 Gasoline-91 Diesel <br /> Sump material FRP FRP FRP <br /> Sump diameter (inches) 42 42 42 <br /> Sump depth (inches) 50 54 55 <br /> Height from tank top to highest 22 24 14 <br /> _ piping penetration (inches) <br /> Height from tank top to lowest 15 15 16 <br /> electrical penetration (inches) <br /> Method of sump attachment to tank Collar Collar Collar <br /> Condition of sump prior to testing4. Dry Dry Dry <br /> Portion of sump tested Entire Entire Entire <br /> Is system programmed for fail-safe operation? Unknown Unknown Unknown <br /> Was fail-safe verged to be operational? No No No <br /> Was sensor removed for testing? Yes Yes Yes <br /> Was sensor property replaced after testing? Yes Yes Yes <br /> Depth of water level from tank top (inches) 24 26 16 <br /> Wait time for water level to stabilize (hr:min) :10 :10 :10 <br /> Test start time 12:08 PM 11:30 AM <br /> Initial Probe Reading 4.1979 4.1323 <br /> Test end time 12:23 PM 11:45 AM <br /> Final Probe Reading 4.1987 4.1322 <br /> Test duration (hr.min) 0:15 0:15 <br /> --- ——— <br /> Change in water level (10.0000 inches) 0.0008 -0.0001 <br /> _.- ... <br /> Pass/Fail threshold (10.002 inches 1}Hr.) 0.0020 0.0020 <br /> TEST RESULT PASS PASS <br /> Comments: <br /> Found a torn penetration on the 87 STP and would not pass the hydrostatic test. <br /> 0 2015 Walton Engineering,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.