My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2001-2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MOSSDALE
>
444
>
2300 - Underground Storage Tank Program
>
PR0231692
>
COMPLIANCE INFO_2001-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2023 11:29:54 AM
Creation date
6/3/2020 9:51:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2001-2009
RECORD_ID
PR0231692
PE
2361
FACILITY_ID
FA0000212
FACILITY_NAME
Mossdale Chevron
STREET_NUMBER
444
Direction
W
STREET_NAME
MOSSDALE
STREET_TYPE
RD
City
LATHROP
Zip
95330
CURRENT_STATUS
01
SITE_LOCATION
444 W MOSSDALE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231692_444 W MOSSDALE_2001-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 eA M-kulufflr <br />Test Method By. Manufacturer. • Industry Standard professional Engr. O Other{see below} <br />TSt Method 'Uses. i Pressure Q Vacuum p Hydrostatic 0 Other (see below) <br />Measuring Equipment Used: Pressure Gauge (ranged to 10 prig) <br />C�escri�t on ROMO ltun #9 piaina ltun #2 Pit na Run #3 <br />Pipe Manufacturer <br />Ameron <br />Ameron <br />Ameron <br />Pipe Type <br />FRP <br />FRP <br />FRP <br />Primary Pipe Diameter (inches) <br />2" <br />2" <br />2" <br />Secondary Pipe Diameter (inches) <br />3" <br />3" <br />3" <br />Product StoredGasoline <br />- 87 <br />Gasoline - 91 <br />Diesel <br />Method of secondary pipe isolation <br />Termination Boot <br />Termination Boot <br />Termination Boot <br />Location of secondary pipe isolation <br />Sump/UDC <br />Sump /UDC <br />Sump /UDC <br />Estimated length of piping run (feet) <br />205' <br />215' <br />225' <br />(include length of branch runs) <br />Wait time for pressure to stabilize (hr:min) <br />0:30 <br />0:21 <br />0:12 <br />Test start time <br />9:00 AM <br />9:01 AM <br />9:02 AM <br />Initial pressure (psig) <br />5 <br />5 <br />5 <br />Test end time <br />10:00 AM <br />10:01 AM <br />10:02 AM <br />Final pressure (psig) <br />5 <br />5 <br />5 <br />Xxi Test duration (hours:minutes) <br />1:00 <br />1:00 <br />1:00 <br />Change in pressure (psig) <br />0 <br />0 <br />0 <br />Pass/Fall threshold (psig) <br />0.5 <br />0.5 <br />0.5 <br />TEST RESULT <br />PASS <br />PASS <br />PASS <br />Comments: <br />0 2002 Walton Engineering, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.