Laserfiche WebLink
-1 ] <br />v <br />SWRCB, January 2002 <br />7. UNDER -DISPENSER CONTAINMENT (UDCI TESTING <br />Page of <br />Test Method Developed By: ❑ UDC Manufacturer 2 Industry Standard C Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: ❑ Pressure ❑ Vacuum Alydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: SNCCp1J 'TS— S -TS <br />Equipment Resolution: ,QOZ, h <br />UDC # RCE C <br />UDC # TRA►JS <br />UDC # <br />UDC # <br />UDC Manufacturer: <br />UDC Material: <br />aregef'GEa7S,5 <br />a"r�3��,Z�SS <br />UDC Depth: <br />` <br />Height from UDC Bottom to Top <br />of Highest Piping Penetration: <br />„ <br />Height from UDC Bottom to <br />Lowest Electrical Penetration: <br />Condition of UDC prior to <br />testing: <br />®). <br />G i) <br />Portion of UDC Tested <br />2"AQjp1c boaa <br />2" AtROX ?RODUCT" <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />product and water),? <br />Vd Yes IJ No ❑ NA <br />X Yes 11No 11NA <br />- Yes : No _ : NA <br />_] Yes L, No ❑ NA <br />Turbine shutdown response time <br />Is system programmed for fail- <br />safe shutdown?* <br />A Yes ❑ No ❑ NA <br />X Yes J' No ❑ NA <br />;_, Yes ".. No _"NA <br />'-,;Yes .-]No ❑ NA <br />Was fail-safe verified to be <br />op erational?* <br />Yes ❑ No ❑ NA <br />VYes ❑ No ❑ NA <br />Yes ; No ! NA <br />❑ Yes ❑ No ❑ NA <br />Wait time between applying <br />pressure/vacuutn/water and <br />starting test <br />30ev°;NS <br />T®a�n°+aS <br />Test Start Time: <br />3 31 <br />L: M Z.. 4L <br />Initial Reading (R,): <br />6.1459" .'t °i <br />G. `031" (0.'82°0 <br />_ <br />Test End Time: <br />3:30 3i6110 <br />Z. 3: 01 <br />Final Reading (RF): <br />,ly6p" t..'tYC <br />`.1829" <br />Test Duration: <br />IS r.w1„ z <br />% S "1;4 7- -c <br />Change in Reading (RF -R,): <br />001 .0004 <br />,0002"®04 0"� <br />Pass/Fail Threshold or Criteria: <br />Z' <br />UOV, <br />Test Result: <br />Pass ❑ Fail <br />K Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Was sensor removed for testing? <br />Was sensor properly replaced and <br />verified functional after testing? <br />C% Yes ❑ No ❑ NA <br />A Yes ❑ No C; NA <br />Yes ❑ No ❑ NA <br />Yes ❑ No 0 NA <br />- Yes Ci No C] NA <br />Yes = No :._.' NA <br />❑ Yes ❑ No ❑ NA <br />L'Yes ❑ No ❑ N_A <br />_COMMentS — (include information on repairs• made prior to testing, trod reca)intended Jollow-up for failed tests) _ <br />1: RECL 1 ST -res'r fA%L . ";'eGNT<a e—tC%.-"r A%)mc:lIr-J e30 -A 4 c.ott® CW'P• _ <br />R F_ ,T CST 0V <br />If the entire depth of the UDC is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />