My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996-2006
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
3032
>
2300 - Underground Storage Tank Program
>
PR0231758
>
COMPLIANCE INFO_1996-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2023 2:32:29 PM
Creation date
6/3/2020 9:52:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996-2006
RECORD_ID
PR0231758
PE
2361
FACILITY_ID
FA0002127
FACILITY_NAME
WESTERN FOOD & FUEL
STREET_NUMBER
3032
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
3032 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231758_3032 E WATERLOO_1996-2006.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
368
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />0 <br />• <br />• <br />ASSEMBLING COMPONENTS [cont'd] <br />��D D <br />D <br />Important: Do not use lubricant <br />containing particulate matter. <br />C) Connect single adaptor <br />(SA4000, SA2530, SA2515) or <br />Y adaptor (DA4000) into 2" fe- <br />male ball valve at submersible <br />pump. Ball valve (optional) al- <br />lows isolation of line during <br />pressure testing. <br />D) Before attaching primary <br />pipe in tank sumps and dis- <br />penser sumps, place flexible test <br />donut onto the primary pipe. <br />Note: Do not lubricate donuts <br />prior to installation. <br />E) Place a new copper washer <br />on the cone seat of the male <br />fitting. First, apply lubricant <br />(non -granular, clean grease or <br />oil) to the inner surface of the <br />copper washer to aid in keep- <br />ing the copper washer aligned <br />and rotating freely until seated. <br />Then thread the female cou- <br />pling into the male fitting using <br />between 60 and 100 foot pounds <br />of torque. Do not use joint com- <br />pound on threads of fitting. <br />F) Place cap on shear valve. <br />Open poppet valve and test <br />primary to 60 psi. Hold at least <br />1 hour. Allow pipe to stabilize <br />under pressure approximately <br />15 minutes. (Consult local <br />code, as requirements may <br />vary.) Use a soap/water solu- <br />tion to test all fittings. <br />TESTING WITH THE PRIMARY INSTALLED <br />Step One <br />102111111 <br />r <br />i' <br />`` <br />Step Two <br />Push flexible test donut into <br />compression seal at cuff or into <br />bulkhead fitting. <br />Seal test donut to compression <br />seal at cuff or to bulkhead fit- <br />ting with stainless steel clamp <br />provided. Torque clamp 1 to 2 <br />foot pounds. <br />is <br />Step Three <br />Step Four <br />Step Five <br />Pressurize secondary pipe 3 to <br />5 psi and maintain pressure <br />through backfilling and pav- <br />ing procedures. If pressure is <br />maintained, lines are tight. <br />After backfilling and paving, <br />release pressure in secondary <br />lines and loosen clamps hold- <br />ing test donuts. Back off do- <br />nuts. Note: Do not cut test do- <br />nuts off as they may be needed <br />for future air pressure tests. <br />Fasten impact valve with ap- <br />propriate size riser pipe and at- <br />tach to stabilizer bar using TCI <br />components only (BR0004 kit). <br />INSTALLING THE CONDUIT PENETRATION FITTING <br />UB0075 and UB1075 for uncuffed entry into sump <br />Reducer for cuffed entry into sump <br />UB0075 <br />FLAT SURFACE <br />NUT: 25-30 FT LBS <br />CLAMP; <br />30 IN LBS <br />ff CURVED SURFACE <br />NUT: 25-30 FT LBS <br />FU <br />CLAMP: <br />30 IN LBS <br />GASKET <br />Page 5 - Enviroflex Instructions <br />Cut hole using 1-3/4" hole saw <br />(HS0750). After hole is cut, re- <br />move burrs. Then remove clamp <br />and brass nut from the assem- <br />bly. Prior to inserting the fit- <br />ting, run a smooth bead of <br />Bostik 920FS or equivalent <br />sealant around flange of bulk- <br />head. Insert body of bulkhead <br />through hole, making sure the <br />gasket is on the outer surface of <br />the sump. Install the washer <br />and screw on the brass nut and <br />tighten to 25/30 foot pounds. <br />Insert the conduit through the <br />fitting and tighten the clamp <br />with torque wrench (CW0030) <br />to 30 inch pounds. Fill sump <br />with water above penetration <br />to insure fitting is liquid tight. <br />
The URL can be used to link to this page
Your browser does not support the video tag.