Laserfiche WebLink
Page 3 of 7 <br /> 2. SECONDARY PIPE TESTING <br /> Test Method Developed By: Q Piping Manufacturer ®Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ®Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: See attached testing procedures Equipment Resolution: <br /> Piping Run#87 Piping Run#91 Piping Run# Piping Run# <br /> Piping Material: Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith <br /> Piping Diameter: 3" 3" <br /> Length of Piping Run: Approx 175' Approx 175' <br /> Product Stored: Regular Premium <br /> Method and location of Test boot in Sump Test boot in Sump <br /> piping-run isolation: <br /> Wait time between applying 30 minutes 30 minutes <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: 7:49am 7:49am <br /> Initial Reading(R]): 5 PSI 5 PSI <br /> Test End Time: 8:49am 8:49am <br /> Final Reading(RF): 5 PSI 5 PSI <br /> Test Duration: 1 hour 1 hour <br /> Change in Reading(RF-R,): 0 0 <br /> Pass/Fail Threshold or 0.00 0.00 0.00 0.00 <br /> Criteria: <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />