My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4344
>
2300 - Underground Storage Tank Program
>
PR0231766
>
COMPLIANCE INFO_2012-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2023 1:18:05 PM
Creation date
6/3/2020 9:53:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2015
RECORD_ID
PR0231766
PE
2361
FACILITY_ID
FA0003717
FACILITY_NAME
CHEVRON STATION #99840*
STREET_NUMBER
4344
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
Rd
City
Stockton
Zip
95215
APN
10102156
CURRENT_STATUS
01
SITE_LOCATION
4344 E Waterloo Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231766_4344 E WATERLOO_2012-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
330
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 6 of 7 <br /> 7. UNDER-DISPENSER CONTAINMENT UDC TESTING <br /> Test Method Developed By: ❑UDC Manufacturer ®Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum ®Hydrostatic <br /> Q Other(Specify) <br /> Test Equipment Used: See attached testing procedures. Equipment Resolution: <br /> UDC#9/10 UDC#11/12 <br /> UDC Manufacturer: <br /> UDC Material: Fiber lass Fiberglass <br /> UDC Depth: 30" 30" <br /> Height from UDC Bottom to Top 8" 8" <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to 6" 6" <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to <br /> Fair Fair <br /> testing: <br /> Portion of UDC Tested Above highest Above highest Above highest Above highest <br /> penetration penetration penetration penetration <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both ❑Yes Q No®NA ❑Yes❑No®NA ❑Yes ❑No®NA ❑Yes ❑No®NA <br /> product and water)?* <br /> Turbine shutdown response time <br /> Is system programmed for fail- <br /> safe shutdown?* ❑Yes ElNo®NA ❑Yes❑No®NA ❑Yes [:]No®NA E]Yes E]No®NA <br /> Was fail-safe verified to be <br /> operational?* [:1 Yes ElNo®NA [:]YesE]No®NA El Yes E]No®NA ❑Yes r-1No®NA <br /> Wait time between applying <br /> pressure/vacuum/water and 30 minutes 30 minutes 30 minutes 30 minutes <br /> starting test <br /> Test Start Time: 10:13am 10:13am <br /> Initial Reading(R1): 1.5434 3.0023 <br /> Test End Time: 10:28am 10:28am <br /> Final Reading(RF): 1.5446 3.0026 <br /> Test Duration: 15 min 15 min 15 min 15 min <br /> Change in Reading(RF-Ri): 0.00118 0.00031 <br /> Pass/Fail Threshold or Criteria: 0.002 0.002 0.002 0.002 <br /> Was sensor removed for testing? ®Yes❑No❑NA ®Yes[]No❑NA Yes[:]No❑NA ❑Yes❑No❑NA <br /> Was sensor properly replaced and ®yes❑No❑NA ®Yes❑No RNA ❑Yes❑No❑NA ❑Yes❑No❑NA <br /> verified functional after testing? <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> i If the entire depth of the UDC is not tested,specify how much was tested. If the answer to M of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.