My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELM
>
124
>
2300 - Underground Storage Tank Program
>
PR0231866
>
COMPLIANCE INFO_2006-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2020 4:02:36 PM
Creation date
6/3/2020 9:53:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2009
RECORD_ID
PR0231866
PE
2361
FACILITY_ID
FA0003957
FACILITY_NAME
AT&T California - UE020
STREET_NUMBER
124
Direction
W
STREET_NAME
ELM
STREET_TYPE
St
City
Lodi
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
124 W Elm St
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231866_124 W ELM_2006-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
483
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />Test Method Developed By: <br />Page _3_ of _6_ <br />5. SECONDARY PIPE TESTING <br />❑ Piping Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: <br />® Pressure <br />❑ Other (Spec) <br />❑ Vacuum ❑ Hydrostatic <br />Test Equipment Used: 2 INCH ANALOG GAUGE <br />Equipment Resolution: <br />Piping Run # Piping Run # <br />Piping Run #PIPING <br />Piping Run #VENT <br />Piping Material: POLY <br />FIBERGLASS <br />Piping Manufacturer: <br />WESTERN <br />FIBERGLASS <br />AMERON <br />Piping Diameter: <br />4" <br />3" <br />Length of Piping Run: <br />APPROX. 80 FEET <br />APPROX. 40 FEET <br />Product Stored: <br />RED DIESEL <br />DIESEL VAPOR <br />Method and location of <br />piping -run isolation: <br />RUBBER BOOTS <br />RUBBER BOOTS <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />30 MINUTES <br />30 MINUTES <br />Test Start Time: <br />8:30 <br />9:25 <br />Initial Reading (RO: <br />5 PSI <br />5 PSI <br />Test End Time: <br />9:30 <br />10:25 <br />Final Reading (RF): <br />5 PSI <br />5 PSI <br />Test Duration: <br />1 HOUR <br />1 HOUR <br />Change in Reading (RF -RI): <br />0" HG <br />0 PSI <br />Pass/Fail Threshold or <br />Criteria: <br />0 PSI <br />0 PSI <br />Test Result: ® Pass ❑ Fail ® Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br />Comments — (include information on repairs made prior to testing and recommended follow-up for failed tests) <br />The Piping Secondary (Supply and Return uses <br />same secondary) passed the Secondary Test. No <br />repairs are needed at this time <br />The Vent Secondary piping passed the three (3) year test. No repairs are needed at present time. <br />
The URL can be used to link to this page
Your browser does not support the video tag.